Before Operation - Daikin VRV IV+ Installer And User Reference Manual

Table of Contents

Advertisement

15
|

Before operation

15 Before operation
Installer and user reference guide
140
WARNING
This unit contains electrical and hot parts.
WARNING
Before operating the unit, be sure the installation has been carried out correctly by
an installer.
NOTICE
Never inspect or service the unit by yourself. Ask a qualified service person to
perform this work.
CAUTION
It is not good for your health to expose your body to the air flow for a long time.
CAUTION
To avoid oxygen deficiency, ventilate the room sufficiently if equipment with burner
is used together with the system.
CAUTION
Do NOT operate the system when using a room fumigation-type insecticide.
Chemicals could collect in the unit, and endanger the health of people who are
hypersensitive to chemicals.
NOTICE
Be sure to turn on the power 6 hours before operation in order to have power
running to the crankcase heater and to protect the compressor.
This operation manual is for the following systems with standard control. Before
initiating operation, contact your dealer for the operation that corresponds to your
system type and mark. If your installation has a customised control system, ask
your dealer for the operation that corresponds to your system.
Operation modes (depending on indoor unit type):
Heating and cooling (air to air).
Fan only operation (air to air).
Heating and cooling (air to water).
Dedicated functions exist depending on the type of indoor unit, refer to dedicated
installation/operation manual for more information.
RYYQ+RYMQ+RXYQ8~20U7Y1B
VRV IV+ heat pump
4P546228-1A – 2019.10

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents