Checking The Safety Valve Function; Checking The Electrical Connections For Firm Seating; Checking All Gas Equipment For Leaks At Operating Pressure; Fitting The Front Panel - Viessmann Vitodens 100-W B1HF Series Installation And Service Instructions Manual

Wall mounted gas condensing boiler
Table of Contents

Advertisement

Checking the expansion vessel and system...
1. Drain the system until "0" is shown on the display.
Note
For pressure indicator on the home screen,
repeatedly until the pressure gauge symbol is
displayed.
2. If the pre-charge pressure of the expansion vessel
is lower than the static system pressure: Top up
with nitrogen at the valve of the diaphragm expan-
sion vessel until the pre-charge pressure is 0.1 to
0.2 bar (10 to 20 kPa) higher than the static system
pressure.

Checking the safety valve function

Checking the electrical connections for firm seating

Danger
Contact with live components can lead to seri-
ous injury from electric current. Some compo-
nents on PCBs remain live even after the power
supply has been switched off.
Never touch the wiring chambers (control unit
and power supply connections).
When working on the appliance, isolate the
system from the power supply, e.g. at a sepa-
rate MCB/fuse or a mains isolator. Check the
system is no longer live and safeguard against
reconnection.
Prior to working on the appliance, wait at
least 4 min until the voltage has completely
dropped out.

Checking all gas equipment for leaks at operating pressure

Danger
Escaping gas leads to a risk of explosion.
Check gas equipment (including inside the appli-
ance) for leaks.

Fitting the front panel

See page 30.
Commissioning, inspection, maintenance
(cont.)
3. Top up with water until the charge pressure of the
cooled system is at least 1.0 bar (0.1 MPa), and is
0.1 to 0.2 bar (10 to 20 kPa) higher than the pre-
charge pressure of the expansion vessel.
Permiss. operating pressure: 3 bar (0.3 MPa)
Note
The expansion vessel is supplied from the factory
with a pre-charge pressure of 0.7 bar.
Do not allow the pre-charge pressure to fall below
this value (boiling noises). This also applies to sin-
gle floor heating systems or attic heating centres
(no static pressure).
Top up with water until the charge pressure is 0.1
to 0.2 bar above the pre-charge pressure.
Note
Only use suitable and approved leak detection agents
(EN 14291) and devices for the tightness test. Leak
detection agents with unsuitable constituents (e.g.
nitrides, sulphides) can cause material damage.
Remove residues of the leak detection agent after test-
ing.
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents