Download Print this page

Yeti Cycles SB95-C 2013 Owner's Manual page 10

Advertisement

ASSEMBLY
YETI TIPS
Make sure your tools are in good condition.
A worn allen key can round the hex on a bolt
not allowing for proper torque.
Torque settings are listed throughout the
instructions. It is also import to prep all bolt
threads. The instructions denote whether
to use a blue or pink Loctite compound or
grease.
Warning: Service on Yeti bicycles requires special knowledge
and tools. Yeti Cycles recommends that all service and
repairs be performed by an authorized Yeti Dealer
20.
TOOLS NEEDED
• Dead blow hammer
• 2.5mm allen key
• Two - 5mm allen keys
• Two - 6mm allen keys
• 10mm allen key
• Guide pin tool
• Lock ring pliers
• Grease
• Blue and Pink loctite
01.
Place the 60mm OD quad o-ring by the non-drive
side main pivot bushing. The o-ring should be
flush with the bushing.
03.
Lightly grease the 40mm integrated axle and
insert it through the drive side main pivot bearing.
Ensure the main pivot pin bearing is aligned with
the bearing on the non-drive side.
02.
Do not grease the 45mm integrated axle. Insert
the axle into the frame through the non-drive side
main pivot bushing.
04.
Lightly grease the threads on the stop bolt and
tighten into the eccentric housing with a 6mm
allen key. Ensure the main pivot axle bearing is
rotated to 3 o'clock during this step
Torque to 40-45 in/lb.
21.

Advertisement

loading