Pedestal Mounting - Chamberlain LiftMaster Professional SW420 Manual

Light duty swing gate operator
Hide thumbs Also See for LiftMaster Professional SW420:
Table of Contents

Advertisement

NOTE: For the following instructions refer to Figures 1 & 2.
1. Locate and anchor pedestal. Pedestal should be parallel and square
to the gate.
IMPORTANT NOTE: The distance between mounting pedestal and the
relative location of the operator to the gate and fence is critical.
2. Locate electrical conduit, as required, prior to pouring concrete.
3. Bolt the mounting brackets to the pedestal.
4. Secure the operator to the pedestal by dropping it onto the pedestal
and allowing the mounting studs to slip through the holes on the
pedestal brackets. Secure with hex nuts provided.
Figure 2
P E D E S T A L M O U N T I N G
Pedestal mount
Kit 65RSWP
Power and control wiring
should be run in seperate conduit
Concrete Pad
2" to 4"
above grade
Depth required
by local codes or
below frost line
11
Figure 1
Hinge Pin
Pivot
Gate
14"
Parallel Mount
Hinge Pin
Pivot
Gate
14"
Pedestal 24" deep
in-ground minimum
Perpendicular Mount
Bolt typ. (4x) from
bracket to pedestal
Fence Line
26"
Fence Line
26"
Nut Typ. (8x)

Advertisement

Table of Contents
loading

Table of Contents