Panasonic NS1000 Manual page 243

Classroom material (trainer)
Hide thumbs Also See for NS1000:
Table of Contents

Advertisement

1.1 UPS Connection and setting (2)
1. Connect the UPS as described in the Installation manual
2. Set the NS1000 Shutdown threshold via the WebMC
Maintenance -> Status -> Equipment Status -> 1. UPS
UPS Status can be seen here
Set the UPS Battery Level, that
when reached, will cause the
PBX to Shutdown
NB: UPS Status alerts can also be sent via email.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents