Horizon Fitness SPF-10II Manual page 49

Stitcher & folder
Table of Contents

Advertisement

6-1 Installation Instruction
C. PJ-77 (jogger Tray)
(1) Install connector CNC at the delivery end
of SPF-10II with hooks of CNC inserted in
key hole of SPF-10II.
(2) Connect connector cable of CNC to recep-
tacle of SPF-10II.
(3) Install PJ-77 at the delivery end of SPF-
10II and connect cable of PJ-77 to recep-
tacle of SPF-10II.
NOTE
Optional forked connector is required when
PJ-77 is installed with SPF-10II.
From Conveyor
Connector CNC,
or CNS
From Trimmer,
Criss-cross,
Stacker Receiving
Tray or PJ-77
45
6. Installation Instruction
From Connector
CNA, CNP or CNM
From Collator

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents