What This Chapter Contains; Prevention Of Unexpected Start-Up (+Q950); Installation Of The Agps Board - ABB ACS800 Series Hardware Manual

Hide thumbs Also See for ACS800 Series:
Table of Contents

Advertisement

Installation of the AGPS board (Prevention of
unexpected start-up, +Q950)

What this chapter contains

This chapter describes electrical installation of the optional Prevention of
unexpected start-up function (+Q950) of the drive, and gives instructions for starting
up, validating and using the function.

Prevention of unexpected start-up (+Q950)

The optional Prevention of unexpected start-up function includes an external AGPS
board which is connected to the drive and an external power supply. See also
chapter

Installation of the AGPS board

WARNING! Dangerous voltages can be present on the AGPS board even when the
115...230 V AC supply is switched off. Follow the
pages of this manual and the instruction in this chapter when working on the AGPS
board.
Make sure that the drive is disconnected from the mains (input power) and the
115...230 V AC source for the AGPS board is switched off during installation
and maintenance. If the drive is already connected to the mains, wait for 5 min
after disconnecting mains power.
WARNING! The supply voltage for the AGPS board is 230 V AC. If the board is
supplied with 24 V DC, the board is damaged and it needs to be replaced.
Prevention of unexpected start-up (option
Installation of the AGPS board (Prevention of unexpected start-up, +Q950)
+Q950), page 48.
Safety instructions
on the first
77

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-01 seriesAcs800-u1 seriesAcs800-01-0001-2Acs800-01-0002-2Acs800-01-0003-2Acs800-01-0004-2 ... Show all

Table of Contents