Download Print this page

GCE druva 34 Series Instructions For Use Manual page 24

Gas supply panel

Advertisement

Available languages

Available languages

5.6 SEQUENCE OF FUNCTIONS
Both cylinders are full and connected to the unit. The change-over switch lever is pointing to
the right. The cylinder and service gas valves are being opened slowly.
purging
gas
EN
When the right-hand cylinder is empty the pressure reducer switches automatically to the left-
hand cylinder.
purging
gas
The left-hand cylinder is now providing the gas supply, the back pressure decreases slightly.
service gas
outlet
Ready for use / Gas fl ow from right hand cylinder
service gas
outlet
Gas fl ow from left-hand cylinder / Right cylinder empty
Page 24/44
purging
gas
purging
gas

Hide quick links:

Advertisement

loading

This manual is also suitable for:

35 series39 seriesBmd 500-35Bmd 500-34Bmd 500-39