Download Print this page
R&G CP0473 Fitting Instructions Manual

R&G CP0473 Fitting Instructions Manual

Crash protectors indian ftr1200 + ftr1200s 2019-

Advertisement

Quick Links

CP0473
PAGE 1 OF 14
FITTING INSTRUCTIONS FOR CP0473 CRASH PROTECTORS
INDIAN FTR1200 + FTR1200S 2019-
T
.
HIS KIT CONTAINS THE ITEMS PICTURED AND LABELLED OVER PAGE
S
.
OME PARTS MAY BE SHOWN FOR CLARITY OF INSTRUCTIONS ONLY
D
.
O NOT PROCEED UNTIL YOU ARE SURE ALL PARTS ARE PRESENT
P
.
LEASE READ ALL INSTRUCTIONS BEFORE PROCEEDING
IF IN ANY DOUBT WHEN FITTING OUR PRODUCTS, CONSULT ONE OF OUR DEALERS
OR HAVE FITTED BY A QUALIFIED TECHNICIAN.
P
LEASE NOTE THAT THE WAY THE KIT IS PACKED DOES NOT NECESSARILY REPRESENT THE WAY OF
.
MOUNTING TO THE BIKE
I
,
N THE EVENT OF RUBBER WASHERS BEING USED TO HOLD COMPONENTS ONTO BOLTS
.
THESE RUBBER WASHERS CAN BE THROWN AWAY
DIGITAL COPIES OF THESE INSTRUCTIONS ARE AVAILABLE FROM:
WWW.RG-RACING.COM
R&G Racing
Unit 1, Shelly's Lane, East Worldham, Alton, Hampshire GU34 3AQ.
Tel: +44 (0)1420 89007 Fax +44 (0)1420 87301
www.rg-racing.com
Email:
info@rg-racing.com

Advertisement

loading

Summary of Contents for R&G CP0473

  • Page 1 CP0473 PAGE 1 OF 14 FITTING INSTRUCTIONS FOR CP0473 CRASH PROTECTORS INDIAN FTR1200 + FTR1200S 2019- HIS KIT CONTAINS THE ITEMS PICTURED AND LABELLED OVER PAGE OME PARTS MAY BE SHOWN FOR CLARITY OF INSTRUCTIONS ONLY O NOT PROCEED UNTIL YOU ARE SURE ALL PARTS ARE PRESENT...
  • Page 2 PAGE 2 OF 14 CP0473 TOOLS REQUIRED GENERAL TORQUE SETTINGS • M4 BOLT = 8Nm SOCKET AND RATCHET SET TO INCLUDE 18mm AND 19mm SOCKETS M5 BOLT = M6 BOLT = M8 BOLT = 20Nm 0 BOLT = 40Nm M12 BOLT = 40Nm...
  • Page 3 CP0473 PAGE 3 OF 14 ASSEMBLY DIAGRAM 1—LHS ASSEMBLY DIAGRAM 2—RHS R&G Racing Unit 1, Shelly’s Lane, East Worldham, Alton, Hampshire GU34 3AQ. Tel: +44 (0)1420 89007 Fax +44 (0)1420 87301 www.rg-racing.com Email: info@rg-racing.com...
  • Page 4 PAGE 4 OF 14 CP0473 Picture 1 Picture 2 Picture 3 Picture 4 Picture 5 R&G Racing Unit 1, Shelly’s Lane, East Worldham, Alton, Hampshire GU34 3AQ. Tel: +44 (0)1420 89007 Fax +44 (0)1420 87301 www.rg-racing.com Email: info@rg-racing.com...
  • Page 5: Fitting Instructions

    CP0473 PAGE 5 OF 14 FITTING INSTRUCTIONS Left Hand Side (as you sit on the bike) • Before fitting the R&G crash protectors, it is advised that a jack is positioned underneath the bike at a suitable point to support the weight of the engine during fitment as in picture 1.
  • Page 6 PAGE 6 OF 14 CP0473 CONSUMER NOTICE The catalogue description and any exhibition of samples are only broad indications of the Products and R&G may make design changes which do not diminish their performance or visual appeal and supplying them in such state shall conform to the order.
  • Page 7 CP0473 PAGE 7 OF 14 NOTICE DE MONTAGE POUR CP0473 PROTECTIONS CRASH INDIAN FTR1200 + FTR1200S 2019- E KIT CONTIENT LES ARTICLES EN PHOTO ET ETIQUETTES SUR LA PAGE LES PARTIES PRESENTÉES PEUVENT ETRE UNIQUEMENT REPRESENTATIVES POUR LA CLARTE DES INSTRUCTIONS E PAS ROCÉDER AU MONTAGE AVANT DE VOUS ÊTRES ASSURE QUE TOUTES LES PIECES SOIENT PRÉSENTES...
  • Page 8: Outils Requis

    PAGE 8 OF 14 CP0473 OUTILS REQUIS VALEURS DE SERRAGE • M4 BOULON = 8Nm Clé à cliquet + douille 18mm et 19mm M5 BOULON = M6 BOULON = M8 BOULON = 20Nm 0 BOULON = 40Nm M12 BOULON = 40Nm...
  • Page 9 CP0473 PAGE 9 OF 14 SCHEMA DE MONTAGE 1—GAUCHE SCHEMA DE MONTAGE 2—DROIT R&G Racing Unit 1, Shelly’s Lane, East Worldham, Alton, Hampshire GU34 3AQ. Tel: +44 (0)1420 89007 Fax +44 (0)1420 87301 www.rg-racing.com Email: info@rg-racing.com...
  • Page 10: Notice De Montage

    PAGE 10 OF 14 CP0473 NOTICE DE MONTAGE Côté gauche (lorsqu’on est assis sur la moto) • Avant d'installer les protections R&G, il est conseillé de placer un cric sous la moto à un endroit approprié pour supporter le poids du moteur pendant le montage, comme sur la photo 1.
  • Page 11 CP0473 PAGE 11 OF 14 MONTAGEANLEITUNG FÜR CP0473 STURZPADS INDIAN FTR1200 + FTR1200S 2019- ALLE KIT-TEILE SIND UNTEN ABGEBILDET UND GEKENNZEICHNET. DIE ABGEBILDETEN TEILE DIENEN LEDIGLICH ZUR ERKLÄRUNG. ÜBERPRÜFEN SIE ZUERST, DASS ALLE TEILE VORHANDEN SIND. LESEN SIE DIE MONTAGEANLEITUNG KOMPLETT DURCH, BEVOR SIE ANFANGEN.
  • Page 12 PAGE 12 OF 14 CP0473 SIE BENÖTIGEN FOLGENDES WERKZEUG ALLGEM ANZUGSDREHMOMENT M4 SCHRAUBE = 8Nm • STECKSCHLÜSSELSATZ INKL. GRÖSSE 18mm + 19mm M5 SCHRAUBE = M6 SCHRAUBE = M8 SCHRAUBE = 20Nm 0 SCHRAUBE = 40Nm M12 SCHRAUBE = 40Nm...
  • Page 13 CP0473 PAGE 13 OF 14 ZUSAMMENBAU ZEICHNUNG 1— LINKE SEITE ZUSAMMENBAU ZEICHNUNG 2 — RECHTE SEITE R&G Racing Unit 1, Shelly’s Lane, East Worldham, Alton, Hampshire GU34 3AQ. Tel: +44 (0)1420 89007 Fax +44 (0)1420 87301 www.rg-racing.com Email: info@rg-racing.com...
  • Page 14 PAGE 14 OF 14 CP0473 MONTAGEANLEITUNG Linke Seite (in Fahrtrichtung) • Bevor Sie die R&G Sturzpads montieren, empfehlen wir, einen Scherenheber an einem geeigneten Montagepunkt unter das Motorrad zu stellen, um somit das Gewicht des Motors während der Montage zu stützen (siehe Abbildung 1). Ein kleines Stück Holz sollte zwischen Montagepunkt und Heber platziert werden, um die Last zu verteilen.