Summary of Contents for Humanscale QUICKSTAND LITE
Page 1
QUICKSTAND LITE REWORK INSTRUCTIONS OVERVIEW/BACKGROUND DIFFICULTY Intermediate Below are step-by-step instructions to rework your QuickStand Lite. If you have any questions, contact Humanscale Support at QSLinquiry@humanscale.com REWORK TIME or 855-319-0315. 25 Minutes REWORK KIT CONTENTS Item Quantity Description Number Included...
Page 2
QUICKSTAND LITE REWORK INSTRUCTIONS Find a safe place to store monitors, mice and any other peripherals that may be installed on the QuickStand Lite (QSL). Check if keyboard and mouse are hardwired. If so, trace cables back to computer port or dock. Label cables carefully to prevent errors when reinstalling.
Page 3
QUICKSTAND LITE REWORK INSTRUCTIONS With the dynamic arm in the fully upright position, lift the QSL head straight up so that the arm link pin comes completely out of the socket on the end of the dynamic arm. Carefully put the QSL head with the keyboard platform and crossbar (if included) onto the work surface/desk.
Page 4
QUICKSTAND LITE REWORK INSTRUCTIONS Dispose/recycle all parts all parts except dome washer. Items to be discarded are as follows: • Shoulder bolt • Lever washer • Cam pin • Lever • Rectangular cam fulcrum • Rectangular ring • Spherical washer •...
Page 5
QUICKSTAND LITE REWORK INSTRUCTIONS Tighten the bolt with the 5mm hex key. Bolt should be firm with a little bit of give. If the arm link pin rotates as you tighten the shoulder bolt, hold it steady with your free hand.
Page 6
QUICKSTAND LITE REWORK INSTRUCTIONS Carefully remove the dynamic arm by lifting straight up, allowing the arm link pin to come clear out of the base socket. Existing arm may be disposed/recycled locally. Install the new M8 Long Dynamic arm, making sure the plastic washer stays on the dynamic arm link pin as it slides into the QSL base socket.
Page 7
QUICKSTAND LITE REWORK INSTRUCTIONS Loosen 5mm shoulder bolt one half turn, or just until platform can be easily positioned so that it is lying flat on a flat surface such as the desk or table. After shoulder screw loosened, platform leveled...
Page 8
QUICKSTAND LITE REWORK INSTRUCTIONS Reinstall the monitor(s) and adjust the monitor arm tension to balance the monitor(s). Using the 5mm hex key, turn the tension screw clockwise to increase lift of arm and reduce tension. Turn screw counterclockwise to reduce lift and add tension. QSL with monitors and keyboard on platform should stay in position without sinking down or rising up when tension is properly adjusted.
Need help?
Do you have a question about the QUICKSTAND LITE and is the answer not in the manual?
Questions and answers