Identify The Rack Location To Install The System; Install The Rails; Cable Management Assembly (Cma) - Dell EMC Data Domain DD6800 Installation Manual

Table of Contents

Advertisement

Figure 5. Cable management assembly (CMA)

Identify the rack location to install the system

Identify the designated location for the system controller or controllers in the rack.
● When using systems with ES30 shelves:
○ The designated location for a single node, or the primary node of an HA pair is U13-U14 in rack 1.
○ The designated location for the standby node of an HA pair is U15-16 in rack 1.
● When using systems with DS60 shelves:
○ The designated location for a single node, or the primary node of an HA pair is U22-U23 in rack 1.
○ The designated location for the standby node of an HA pair is U25-26 in rack 1.
NOTE:
The designated slots in the rack are the recommended location for the systems to support the cabling described in
this document. Other locations may require different cable lengths for some configurations.

Install the rails

This procedures describes how to install the mounting rails.
Steps
1. If EIA rail mounting holes of 7.1 MM diameter round, or M5, 12-24, 10-32 threaded, are being used, install the filler using the
pin as shown. If not, proceed to the next step.
Once the filler is installed to the rail, the installation can continue as follows.
14
Install the System in the Rack

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents