WaRningS installation must be carried out by qualified staff and/or manufacturer technical assistance, who must provide the buyer with a declaration of conformity for the system and will assume full responsibility for final installation and as a consequence the correct functioning of the installed product.
OpeRaTiOnS 2.1. BuRn pOT BRackeT (lucRezia idRO mOdel Only) aTTenTiOn: Before igniting the stove, make sure the bracket indicated in the figure has been removed, by removing the screw that fixes it (in The mOdelS WheRe enviSiOned). figure 1...
The TileS (lucRezia idRO) 1. remove the 4 fixing screws of the 2 cast iron sides as indicated 3. position the central tile in the appropriate iron hooks. in the drawing. 4. fix the upper grate with the 2 previously removed screws.
SafeTy for safety reasons, remember that: the stove must not be used by persons (including children) with reduced physical, sensorial and mental capacities or who are unskilled persons, unless they are supervised and trained regarding use of the appliance by a person responsible for their safety. children must be controlled to ensure that they do not play with the appliance.
Technical feaTuReS nota bene: for the features of the “lucrezia idro” model, consult the sheet attached to the inside of the product. features lp 14 lp 20 lp 30 weight height 1327 1368 1406 width depth flue exhaust pipe diameter air intake pipe diameter max.
Page 11
lp14_20 lp30 the graphics given below illustrate the behaviour of the pump used on our thermo-products at the speeds that can be set. pump integrated in the thermo product with 5 yes yes m head volume of expansion vessel integrated into thermo-product (l) Burn pot automatic cleaning mechanism...
Rearm must be performed by qualified staff and/or the manufacturer's technical after-sales lucrezia idro assistance. pump integrated in the thermo product with 5 m head volume of expansion vessel integrated...
(ministerial decree dated 22.01.08 n°37). system. the product has been designed and realised to work with closed vessel extraflame S.p.a. declines all responsibility for damages to systems. objects and/or persons caused by the system.
auTOmaTic closed expansion vessel the vessel maximum exercise pressure must not be lower than the calibration TheRmOSTaTic mixeR valve pressure of the safety valve, increased by overpressures, characteristic of the same valve, bearing in mind the eventual level difference between vessel and valve (mandaTORy) and the pressure generated by the functioning of the pump.
inSTallaTiOn cOmBuSTiOn pROducT evacuaTiOn SySTemS flue gas exhaust system independent from the appliance constituted by a fitting or smoke channel, chimney or individual the installation must be in compliance with: flue and chimney cap. uni 10683 (2005) heat generators fed with wood and ...
BOileR cOmpaRTmenT Below find images relative to the measurements that the company recommends are respected. flue for the “lucrezia idro” model, respect the measurements for lp14. inspection figure 9 the horizontal routes will have to have a minimum upward ...
875 mm 875 mm 530 mm 530 mm 525 mm 525 mm LP14 LP14 LP20 LP20 LP30 LP30 figure 10 figure 12 non-inflammable RefeRenceS objects 500 mm 1,000 mm 1,000mm 300 mm > 80 cm 10.3.4. appliance cOnnecTiOn TO The flue and cOmBuSTiOn pROducTS evacuaTiOn the flue must receive the discharge from only one heat generator.
and dilution of the combustion products and, however, outside chimney cap the reflux area in which the formation of counterpressures windproof occurs. such area has different dimensions and configuration depending on the covering inclination angle. it is therefore necessary to adopt the minimum heights indicated in the figure layouts below.
14961 requisites. the adjacent room cannot be set up as garage, storage extraflame recommends the use of pellets with a for combustion material or activity with danger of fire. diameter of 6mm with its products. WaRningS!!! 10.5.
pROducT funcTiOnaliTy 12.1. cOnTROl BOaRd figure 20 a on/off Button p2 p3 asetting h2o temperature p4 p5 a regulation of functioning power a display of the various text messages a display of the power 12.2. diSplay icOnS key indicates the presence of an alarm. it indicates functioning of the fumes motor.
13.3. WORk extraflame has an optional additional board that allows the boiler the following further functions when managing the system. The table below indicates the various possibilities that the boiler will work to reach the water temperature set by the user the optional can offer.
14.2. addiTiOnal TheRmOSTaT inSTallaTiOn switch the appliance off using the master switch positioned on the rear of the stove. remove the plug from the socket. refer to the electrical layout to connect the two thermostat cables onto the relative clamps positioned don the rear of the machine, one is red and the other black (stBy clamp).
uSeR paRameTeRS funcTiOn menu display d2 display d1 scrolling text value TempeRaTuRe SeT h2O Boiler water t° regulation 65°c...80°c enaBle chROnO chrono activation/deactivation On/Off pelleT selecting the percentage of pellet feed RegulaTiOnS -30...+20 RegulaTiOn STOve STaTuS ST1...ST10 status of the value STaTuS value uSeR menu...
16.1. TempeRaTuRe SeT 16.3. STaTuS the menu allow to display the boiler status this set allows to regulate the temperature of the water in the boiler, with a range from 65°c to 80°c. procedure procedure press key p3 key until STaTuS press the is displayed.
cOnSenTS fOR vaRiOuS dayS RegulaTe cOnfiRm after the first time period times have been programmed, keyS display d1 should show the day of the week in running mode. if this is not the case, press the p5 key again. STaRT - pRg1 Off - 00:00 p5 key to select the day and the p2 and p3 key...
quick acceSS diagRam for 3 seconds TempeRaTuRe p2/p3 SeT h2O 65°c...80°c enaBle p2/p3 On/Off chROnO RegulaTiOnS adjuSTmenT p2/p3 -30...+20 pelleTS display of STaTuS p2/p3 STaTuS the various STOve components menu hOuRS minuTeS ...yeaR uSeR clOck p2/p3 p2/p3 p2/p3 p2/p3 mOn...Sun Off...23:50 value value...
*fixed in start-up and work mode. during the work phase it displays the flame with real work power extraflame has an optional additional board that allows the boiler the following further functions when managing the system. The table below indicates the various possibilities that the optional can offer.
lp30 menu STRucTuRe TempeRaTuRe SeT h2O SeT pOWeR SeT pOWeR uSeR RegulaTiOn manual/ auTOmaTic pelleT RegulaTiOn STaTuS STOve STaTuS SeT clOck SeT clOck SeT uSeR SeT chROnO SeT chROnO language language SeT heaT SeT heaT exchangeR exchangeR inSTalleR* lp30 menu structure...
19.1. TempeRaTuRe RegulaTiOn from the main screen, turn p2 to select the icon SET H20 press p2 to confirm turn p2 to regulate the temperature confirm and memorising by pressing p2 ° to exit without memorising, press key p1 ...
enaBle chrono enaBle chrono 19.5. pelleT SeTTing the boiler allows regulation of the pellets via the relative menu. considering the different types of pellets on the market, the user can increase or decrease the amount of pellets as a percentage. from the main screen, turn p2 to select the icon ...
19.6. STaTuS menu the status menu is used to display the status of the inputs and outputs in the board from the main screen, turn p2 to select the icon press p2 to confirm (display of status 1 screen) ...
set clock user menu saturday hours SeT clOck minutes set chrono date language month year set heat exchanger 19.7.2. chROnO RegulaTiOn through regulation of the chrono, i.e. automatic mode, the boiler can ignite and switch off in automatic mode. the chrono has absolute priority over every control, therefore this factor must be considered.
19.7.3. SeT language menu the boiler allows to set the following languages: italian, english, french, german and spanish. italian is the default setting turn p2 to select the icon press p2 to confirm language turn p2 to select “ ”...
lp14_20_30 BOileR cleaning (some images could be offset from the original model). maintenance operations guarantee correct functioning of the product through time. failure to comply with these operations can jeopardise the safety of the product. the cleaning operations must be performed when the stove is completely cold. figure 24 20.1.
21.3. cleaning The aSh dRaWeR the ash drawer must be emptied at least weekly and however on the basis of the frequency of use of the machine. Before emptying some images could be offset from the original model.
Technician yeaRly cleaning fumes motor (disassembly and cleaning and fumes pipe), new silicone in envisioned points gaskets inspections, ash drawer and door (replace them and apply silicone where envisioned) heat exchanger feed box (complete emptying and cleaning). ...
diSplayS display Reason Solution STaRT the start phase is in progress the continuous feeding of the pellets during the ignition pelleT feeding phase is in progress igniTiOn the boiler is in ignition phase STaRT-up the work preparation phase is in progress the normal working phase is in progress, the boiler is WORk working at the power set...
Page 40
E-mail: info@extraflame.com extraflame reserves the right to change the features and data stated in the following file at any time without forewarning, in order to improve its products. this manual cannot be considered as a contract for third parties.
Need help?
Do you have a question about the Lucrezia and is the answer not in the manual?