Operations Following Powering On - Panasonic FP7 Series User Manual

Cpu unit
Hide thumbs Also See for FP7 Series:
Table of Contents

Advertisement

5.2.2 Operations following Powering On

When the unit is powered on, whether in the PROG. mode or in the RUN mode, the project is
transmitted from ROM1 to RAM.
 Switch setting conditions
Switch
Mode switch
Card operation switch
 Procedure
1. The execution project is automatically transmitted from ROM1 to RAM.
2. In the RUN mode, operation is started.
Setting
PROG. or RUN
ROM
5.2 RAM/ROM Operation
5-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afp7cps21Afp7cps31Afp7cps31eAfp7cps41e

Table of Contents