4.8.3 Battery cabinet connection to TLE Scalable Series 40 - 150

A TTENTION !
9 2 2 B
9 2 3 B T he installation and cabling of the battery cabinet must be performed by QUALIFIED
SERVICE PERSONNEL.
9 2 4 B B efore proceeding to "Battery cabinet" connection, follow the Safety rules
concerning the battery.
9 2 5 B M ake sure that the UPS is not powered and the "Battery breaker" is open (Pos. O).
9 2 6 B B efore closing the "Battery breaker" verify the correct polarity of the battery
connection.
9 2 8 B B attery
9 3 1 B D imensions (W x D x H)
9 3 3 B T ype of cables connection
"Battery cabinet" can be located on either side of the UPS.
The connecting cables (+/-/PE) are supplied with the battery cabinet.
Connect the cables to UPS bus bars "+/-/PE" using M8 bolts with a torque wrench at 195 Lb-in / 22 Nm.
N OTE !
9 4 1 B
9 4 2 B C heck for sufficient floor loading capacity.
9 4 3 B F or further information please consult the "Installation, Operation &
Maintenance Manual" of the "Battery cabinet".
Battery
cabinet
+ Positive pole
A TTENTION !
9 4 6 B
9 4 7 B I t is mandatory to ground the battery cabinet to UPS!
9 4 8 B T o meet standards concerning electromagnetic compliance, the connection
between the UPS and external Battery cabinet must be done by using a shielded
cable or suitable shielded (metal) conduit!
Modifications reserved
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
B attery cabinet
9 2 7
3 battery cabinets / 4 battery cabinets
29.80 x 29.50 x 75.00 inches / 757 x 750 x 1905 mm
40.00 x 29.50 x 75.00 inches (1016 x 750 x 1905 mm)
9 3 4 B 7 5°C rating; size per NEC Table 310.16 and/or all applicable national and
local codes (see also Section 4.7.4).
Wiring shall comply
to local regulations !
Output
cables
+
To UPS
-
bus bars
PE (GND)
F ig. 4.8.3-1 Battery cabinet connection to TLE Scalable Series 40 - 150
1 3 6 2 B
- Negative pole
Critical Power
1 battery cabinet / 2 battery cabinets
1 3 6 1 B
XA
Q1
+
_
PE
Q1
PE Battery cabinet ground
Installation Guide TLE Scalable Series 40 - 150 UL S1