GE TLE Scalable Series Installation Manual page 17

Table of Contents

Advertisement

TLE Scalable Series 40 - 150
1.48"
37.5mm
Fig. 4.4.1-2 TLE Scalable Series 40 - 150
Opening on the bottom of the cabinet for input and output cable connections
Fixing of the UPS cabinet TLE Scalable Series 40 – 150 on the floor
The UPS cabinet is free standing and normally
does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the
floor by bolting it with the supporting blocks to
the floor.
22.5mm
Fig. 4.4.1-4 TLE Scalable Series 40 - 150 – UPS cabinet floor fixing points
Modifications reserved
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
Opening for input and output cable connections
Utility input
Load output
Battery
FRONTAL SIDE
20.67"
1.48"
525mm
37.5mm
23.63"
600mm
FRONTAL SIDE
0.89"
21.85"
555mm
23.63"
600mm
Critical Power
TLE Scalable Series 40 - 150
provided an opening on the
bottom of the cabinet for the
connection of input and output
cables.
Pay attention to the position of
this opening when choosing the
3.64"
placement of the UPS.
92.5mm
Fig. 4.4.1-3 Fixing of the UPS cabinet on the floor
1.65"
42mm
Ø 0.53"
13.5mm
3.47"
88mm
0.89"
22.5mm
Installation Guide TLE Scalable Series 40 - 150 UL S1
Page 17/53

Advertisement

Table of Contents
loading

Table of Contents