Firing Rates; Test Boiler - Riello RS 1000/EV BLU Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

4.7

Firing rates

The MAXIMUM OUTPUT is chosen from within the continuous
diagram area (Fig. 2).
The MINIMUM OUTPUT must not be lower than the minimum
limit of the diagram:
RS 1000/EV BLU = 4000 kW
RS 1200/EV BLU = 5500 kW
26
RS 1000/EV BLU
24
22
20
18
16
14
12
10
8
6
4
2
0
1000 1800 2600 3400 4200 5000 5800 6600 7400 8200 9000
4.8

Test boiler

The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 3).
If the burner must be combined with a boiler that has not been EC
approved and/or its combustion chamber dimensions are clearly
smaller than those indicated in the diagram, consult the manufac-
turer.
The firing rates were set in relation to special test boilers, accord-
ing to EN 676 regulations.
20123781
Technical description of the burner
Thermal power – kW
In Fig. 3 you can see the diameter and length of the test combus-
tion chamber.
Example:
Output 7000 kW - diameter 120 cm - length 6 m
MODULATING RATIO
The modulating ratio, obtained in test boilers in accordance with
standard EN 676, is 7:1.
10
GB
The firing rate value (Fig. 2) has been obtained
considering an ambient temperature of 20 °C, an
atmospheric pressure of 1,013 mbar (approx. 0 m
WARNING
a.s.l.), and with the combustion head adjusted as
shown on page 20.
RS 1200/EV BLU
9800
10600
D11991
11400 12200
Fig. 2
D2448
Fig. 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs 1200/ev blu2011649620116498

Table of Contents