Step 3: Fasten the units to the ground (optional)
After positioning the units, make sure they are perfectly level, if necessary inserting suitable solid and sta-
ble shims under the supports.
Finish by fastening them to the ground (tools and fastening components not included). The installer is re-
sponsible for choosing the most suitable means of fastening based on experience (the drawing includes
an example).
There is no need to insert vibration damping material between the machine and the ground as
the moving internal parts transmit no residual vibrations to the outside.