Summary of Contents for Siegenia KFV BS 230 Series
Page 1
ASSEMBLY INSTRUCTIONS Multi-point locks, key operated BS 2200 BS 230X BS 25XX with 130 mm high auxiliary boxes Window systems Door systems Comfort systems...
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Content INTRODUCTION .........4 Assembling the frame parts ......25 5.8.1 Screwing specifications for SKG Producer and service ........4 certified frame parts ........26 Target group of this documentation ..... 4 Adjustment of the airgap ......
• Locking elements must not be misused to hold the KFV Karl Fliether GmbH & Co. KG door open. A company of the SIEGENIA GROUP • Movable or adjustable locking elements Siemensstraße 10 (e.g. deadbolt, latch) must not be painted over.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Transport Symbols used • Block set the door leaf in the frame with door gap The following icons are used in this document: restrictors. useful information or advice •...
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Other types of presentations 1.12 Appropriate disposal Below is a list of symbols used in these instructions and • The multi-point lock and the optional accessories their meanings: should not be disposed of with household waste.
Page 7
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X None of the locking elements may be excluded when the door is open. Force must be exerted on the lever handle only in the normal direction of rotation.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Safety Before starting the assembly work, read the following safety instructions carefully. They are designed to keep you safe and prevent hazards, injuries and material damage. Observe all warning notes. Information This symbol indicates special features and designates facts that require increased attention.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Variants and components The multi-point locks BS 2200, BS 2300 and BS 2500 are equipped with two auxiliary boxes each. The multi-point locks BS 2304 and BS 2504 are equipped with four auxiliary boxes. Three versions of auxiliary boxes are available: timber deadbolt [1], round bolt [2], hook bolt [3].
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Installation Change DIN orientation of the soft lock latch 1 x 3.5 mm There is a slot [1] on the gear box side. The locking spring [2] of the latch shank can be opened through this slot using a slotted screwdriver.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Swing door roller latch 5.2.1 Replace soft lock latch with swing door roller latch 1 x 3.5 mm There is a slot [1] on the gear box side.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X 5.2.2 Adjustment of swing door roller latch f Align the centre part in such a way that the hole [1] is facing forwards. 2 mm f Insert a 2 mm hexagon wrench into the latch shaft through the hole in the centre part.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Change DIN orientation of the fire protection latch The fire protection latch is an integral components of a fire protection multi-point lock. With the exemption of changing the DIN orientation, all other modifications of fire protection multi-point locks are inadmissible.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Installing the multi-point lock f Insert the multi-point f Screw the multi-point lock in the milled door lock to the door leaf. leaf. Adjust the position to the handle nut.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Mounting the handle set Prior to the installation of the handle set, observe the enclosed assembly instructions of the manufacturer. Compare the drilling template for the handle set with the positions of the fixing holes for the main lock before drilling, see chapter 4.1 “Main lock types, key-operated”.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X f Fix the cylinder lock with the cylinder lock screw. f Install the handle set according to the enclosed assembly instructions of the manufacturer. Milling the frame 5.7.1 Assembly specifications for SKG certified frame parts The dimensions for the vertical position must be exactly adhered to for the assembly of the...
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X 5.7.3 Frame milling for BS 2300, BS 2500 Always use safety goggles for milling See chapter 3.1 “Size variants”. work. Starting position The defined milling dimensions given refer to: Centre striker plate = centre auxiliary box The striker plate must be moved: E8H striker plate:...
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X 5.7.4 Frame milling for BS 2304, BS 2504 Always use safety goggles See chapter 3.1 “Size variants”. for milling work. Starting position The defined milling dimensions given refer to: Centre striker plate = centre auxiliary box The striker plate must be moved: E8H striker plate:...
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Assembling the frame parts Horizontal adjustment of the frame parts is performed in accordance with the system axis f Insert the striker plates into the routed pockets of the frame and screw the striker plates into place. Mounting the striker plates for BS 2X00 Mounting the striker plates for BS 2200 (The mounting of 4 additional striker plates for BS2304...
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Adjustment of the airgap Observe the assembly and operating instructions for the door hinges. f In accordance with the enclosed assembly instructions of the door hinge manufacturer, adjust the airgap [1] between the faceplate and frame part.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X 5.9.1 Adjustment of the AT piece When the door is closed, the latch must engage in the AT piece with as little play as possible. The AT piece is horizontally adjustable for this purpose.
Page 29
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X T 10 2.5 Nm f Tighten the two adjustment screws. f Close the door and check whether the latch engages properly. Repeat the adjustments if necessary. The day latch differs from the AT piece by means of a sliding handle [1], releasable fitting part.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X 5.9.2 Correct the Q adjustment The Q adjustment is moved laterally by ± 2.5 mm via two eccentric screws [1]; this lateral adjustment changes the contact pressure of the door on the frame seal.
Page 31
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X f Turn the two eccentric screws [1] to the left or right up to 90°. T 10 1.3 Nm f Tighten the three fixing screws of the Q adjustment firmly. f Close the door and lock with a double turn.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Functional test Check when the door is open Check the functioning of the lever handle and the latch f Press the lever handle down fully. Check the function of the lever handle and the latch.
Page 33
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Projecting the locking elements f Turn the key in the locking direction with a double turn. The main lock bolt and the locking elements of the auxiliary boxes must extend completely and with ease.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Check when the door is closed Checking the engaging of the latch f Close the door. The door must close easily. The latch must engage properly in the AT piece.
Page 35
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Retracting the locking elements f Turn the key in the unlocking direction with a double turn. The main lock bolt and the locking elements of the auxiliary boxes must retract completely and with ease.
KFV – assembly instructions Multi-point locks, key operated, BS 2200, BS 230X, BS 250X Troubleshooting Malfunction of the lever handle The lever handle does not return to its original position by itself. f Check that the lever handle is correctly seated. •...
Need help?
Do you have a question about the KFV BS 230 Series and is the answer not in the manual?
Questions and answers