Maintenance Of The Device - Maktek 20 MK Installation, Operation And Maintenance Instructions

Table of Contents

Advertisement

USE OF PROGRAM CLOCK
If the device has a program clock for programming,
a) Set the clock by turning it manually in the direction of the arrow on the watch dial.
b) There are small program bars around the dial that correspond to 15 minutes periaods each.
When you want boiler to run, the boiler will automatically starts after pulling the bars that are
across the preffered time period.
After adjusting the temperature to the desired temperature, press the main control button to
make the device run.
INSTRUCTIONS FOR USE AND OPERATION OF BOILER WITH HOT WATER
1-In summer use, the boiler must only be operated for hot water. Selector switch position
on the electric panel must be placed at
mode.
2- MAKTEK Cenrtal Heating Boiler with Hot Water automatically starts to produce hot water.
Shortly after the boiler starts running , hot water is given by opening any hot water tap.
3- In the summer months, the boiler works only for hot water. Thermostat should be set to show
the boiler thermometer 80°.

MAINTENANCE OF THE DEVICE

The burner in the MAKTEK Central Heating Boiler has a feature that can be easily removed and
installed and the maintenance can be practically done.
1- The burner can be easily removed by loosening the two imbus screws on the aluminum flange.
The electrical connection of the burner can be removed by removing the socket on the burner and
removing it from the device.
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

25 mk35 mk

Table of Contents