Blichmann Engineering 2 BBL Hybrid Brewhouse Assembly Operation Maintenance Manual

Blichmann Engineering 2 BBL Hybrid Brewhouse Assembly Operation Maintenance Manual

2 vessel

Advertisement

Quick Links

2 BBL Hybrid Brewhouse
2 Vessel
Assembly, Operation, & Maintenance
Congratulations on your purchase, and thank you for selecting the 2 BBL
Hybrid™ Brewhouse from Blichmann Engineering™. We are confident that it
will provide you years of service and many gallons of outstanding beer.
PLEASE READ AND THOROUGHLY UNDERSTAND THIS MANUAL PRIOR TO USE
WARNING:
Sections labeled "Warning" can lead to serious injury or death if not followed. Please thoroughly read these sections and understand them
completely before use. If you do not understand them or have any questions, contact your retailer or our website at
www.blichmannengineering.com before use.
CAUTION:
Sections labeled "Caution" can lead to equipment damage or unsatisfactory performance of the equipment. Please read these sections
thoroughly. If you have any questions, contact your retailer or our website at www.BlichmannEngineering.com before use.
IMPORTANT:
Sections labeled "Important" should specifically be followed to ensure satisfactory results with the product.
IMPORTANT: Power demand for the brewhouse is 32A at 208V (three phase) or 52A at 240V (single phase). Select a main breaker setting for 20% above the appropriate
amperage to avoid nuisance tripping or as directed by your local codes.
Item Number
BEPS-MLT-2BBL
BE-001346-02
BEPS-BK-HLT-2BBL
BEPS-SanitaryHeater-2
BEPS-SanitaryHose-1in-10
BEPS-SanitaryHose-1in-5
BE-000633-00
BE-000868-00
BE-000957-00
BE-000859-00
BE-000866-00
BE-000861-00
2 BBL Hybrid™ 2 Vessel Brewhouse V2
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
IMPORTANT INFORMATION
FOR IMPORTANT SAFETY INFORMATION!
What' s In the Box?
Description
2 BBL Mash Tun
2 BBL False Bottom Assembly
2 BBL Boil Kettle
2 BBL Sanitary Heater Assembly
Low Level Float Switch
10 foot - 1 Inch ID Hose
5 foot - 1 Inch ID Hose
1.5 Inch Tri-Clamp
1.5 Inch Tri-Clamp Gasket
CIP Spear - 1.5 TC
2.5 Inch TC Cap
2.5 Inch Tri-Clamp Gasket
2.5 Inch Tri-Clamp
© Blichmann Engineering, LLC 2019
Quantity
Item Number
1
BE-000863-00
1
BE-001356-00
1
BE-001084-00
2
BE-001186-00
1
BEPS-CHILLER-2.0SQM
1
BE-001345-00
2
BEPS-ControlKit-2Ves-2b
20
BE-001612-00
20
1
2
4
4
Description
1.5 Inch Tri-Clamp Elbow
1.5 Inch Multi Position Valve
1.5 Inch Tri-Clamp CIP Spray Ball
1.5 Inch Sanitary Pipe, 6 Inch Length
Heat Exchanger
2 BBL Stand Pipe
Control Panel
PT 100 RTD Probe
1" Diaphragm Valve
1.5" Tri-Clamp Cap
Quantity
4
3
1
1
1
2
1
2
1
2
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2 BBL Hybrid Brewhouse and is the answer not in the manual?

Questions and answers

Summary of Contents for Blichmann Engineering 2 BBL Hybrid Brewhouse

  • Page 1 Assembly, Operation, & Maintenance Congratulations on your purchase, and thank you for selecting the 2 BBL Hybrid™ Brewhouse from Blichmann Engineering™. We are confident that it will provide you years of service and many gallons of outstanding beer. IMPORTANT INFORMATION...
  • Page 2 It is not necessary to add the spool to the BK. SPOOL FOR MASH TUN ONLY CIP/Sparge Ball Whirlpool Whirlpool Manway Heating Elements Heating Elements Bottom Dump Bottom Dump 2 BBL Hybrid™ 2 Vessel Brewhouse V2 © Blichmann Engineering, LLC 2019 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 3 CFM = Room Volume (ft3) / 6 (you can generally disregard) Hood Size Overhang 6” minimum front and sides Hood Height 32” above kettles 2 BBL Hybrid™ 2 Vessel Brewhouse V2 © Blichmann Engineering, LLC 2019 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 4: Control Panel Installation

    The back of the panel has 4 holes for affixing the panel to the wall of the brewhouse or onto a suitable stand. Mounting hardware or stand is not included. The image below indicates the locations of the main components. Kettle Temperature Controllers (PID’s) Heaters ON Indicator Lamps Heater Control On/Off Switches 2 BBL Hybrid™ 2 Vessel Brewhouse V2 © Blichmann Engineering, LLC 2019 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 5: Single Phase

    Power demand for the brewhouse is 52A at 240V (single phase). Select a main breaker setting for 20% above the appropriate amperage to avoid nuisance tripping or as directed by your local codes. 2 BBL Hybrid™ 2 Vessel Brewhouse V2 © Blichmann Engineering, LLC 2019 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 6 IMPORTANT: Always consult your local codes to determine what type of cable is acceptable, what gauge is required, and maximum lengths of flexible cable allowed. Heating Element Grounds 2 BBL Hybrid™ 2 Vessel Brewhouse V2 © Blichmann Engineering, LLC 2019 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 7: Control Panel Operation

    Indicating the output is energized Change Temperature Change Power Switch between temp control and power control Switch between temp control and power control 2 BBL Hybrid™ 2 Vessel Brewhouse V2 © Blichmann Engineering, LLC 2019 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 8 This is NOT covered under warranty. Ensure the hoses and pump head are filled with liquid before turning on the pump. If you hear a loud squeal stop the pump immediately! 2 BBL Hybrid™ 2 Vessel Brewhouse V2 © Blichmann Engineering, LLC 2019 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 9: Cleaning Your System

    BK/MT: Due to the easy access through the top of the relatively small tanks, and small size of the chiller and pumps, it is usually fastest to scour the kettles with a scrub brush mounted on a pole and spray them out with a hose. Optional cleaning tools are available through Blichmann Engineering to make this a fast and thorough job.
  • Page 10 3. Blichmann Engineering reserves the right to request delivery of the defective component for inspection before processing the warranty claim.

Table of Contents