Download Print this page

Blichmann Engineering 3.5 BBL Hybrid Brewhouse Assembly Operation Maintenance Manual

Advertisement

Quick Links

3.5 BBL Hybrid Brewhouse
Assembly, Operation, & Maintenance
2 Vessel
Congratulations on your purchase, and thank you for selecting the 3.5 BBL Hybrid
Brewhouse from Blichmann Engineering™. We are confident that it will provide you
years of service and many gallons of outstanding beer. This manual will familiarize
you with the use, assembly, and the sanitation procedures for the product.
PLEASE READ AND THOROUGHLY UNDERSTAND THIS MANUAL PRIOR TO USE
WARNING:
Sections labeled "Warning" can lead to serious injury or death if not followed. Please thoroughly read these sections
and understand them completely before use. If you do not understand them or have any questions, contact your
retailer or Blichmann Engineering (www.BlichmannEngineering.com) before use.
CAUTION:
Sections labeled "Caution" can lead to equipment damage or unsatisfactory performance of the equipment. Please
read these sections thoroughly. If you have any questions, contact your retailer or Blichmann Engineering
(www.BlichmannEngineering.com) before use.
IMPORTANT:
Sections labeled "Important" should specifically be followed to ensure satisfactory results with the product.
IMPORTANT: Power demand for the brewhouse is 55A at 208V (three phase) or 79A at 240V (single phase). Select a main breaker setting
for 20% above the appropriate amperage to avoid nuisance tripping or as directed by your local codes.
Item Number
BEPS-MLT-3.5BBL
BEPS-BK-HLT-3.5BBL
BEPS-LIFTSTAND-3.5BBL
BEPS-PUMP-15HP
BEPS-CHILLER-2.0SQM
BEPS-HoseKit-3.5-2V
BE-000957-00
BE-000859-00
3.5 BBL Hybrid Brewhouse 2 Vessel V1
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
IMPORTANT INFORMATION
FOR IMPORTANT SAFETY INFORMATION!
What' s In the Box?
Description
3.5 BBL Mash Tun
3.5 BBL Boil Kettle
Kettle Stand
Control Panel - Single Phase
Sanitary Heater Set of 3 - Single Phase
1/5hp Brewery Pump
Chiller 3.5 BBL
3.5 Hose Assembly Kit
CIP Spear 1.5" Tri Clamp
Cap 2.5" Sanitary
© Blichmann Engineering, LLC 2018
Quantity
Item Number
1
BE-000868-00
1
BE-000633-00
2
BE-000863-00
1
BE-001356-00
1
BE-001084-00
1
BE-001186-00
1
BE-000630-00
1
BE-001132-01
1
BE-000866-00
2
BE-000861-00
Description
Clamp Gasket 1.5"
1.5" Tri Clamp
Tri Clamp Elbow 1.5"
1.5" Multi Position Valve Tri Clamp
CIP Spray Ball
1.5" Sanitary Pipe 6"
Cap 1.5" Sanitary
3.5 BBL Stand Pipe
Clamp Gasket 2.5"
2.5" Tri Clamp
Quantity
11
11
4
3
1
1
1
1
2
2
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 3.5 BBL Hybrid Brewhouse and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Blichmann Engineering 3.5 BBL Hybrid Brewhouse

  • Page 1 Blichmann Engineering (www.BlichmannEngineering.com) before use. CAUTION: Sections labeled “Caution” can lead to equipment damage or unsatisfactory performance of the equipment. Please read these sections thoroughly. If you have any questions, contact your retailer or Blichmann Engineering (www.BlichmannEngineering.com) before use. IMPORTANT: Sections labeled “Important”...
  • Page 2 Reinforcement: Multiple plies of polyester tire cord with wire helix Cover: Grey EPDM Temperature Range: -40°F to +225°F Not for continuous steam service Stainless Steel 1.5 Inch Tri-Clamp ends 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 3 CFM = Room Volume (ft3) / 6 (you can generally disregard) Hood Size Overhang 6” minimum front and sides Hood Height 32” above kettles – approx. 6.5 ft from floor 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 4: Control Panel Installation

    20% above the appropriate amperage to avoid nuisance tripping or as directed by your local codes. Kettle Temperature Controllers (PID’s) Heaters ON Indicator Lamps Heater Control Selector Switch Heating Element Selector Switch Emergency Shutoff 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 5 20% above the appropriate amperage to avoid nuisance tripping or as directed by your local codes. RTD’s – the brewhouse is equipped with two durable high precision PT100 temperature probes. The sensors come prewired to your controler panel. 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018...
  • Page 6 CAUTION – ensure the heater junction box is tight to keep any water out of the box. NEVER immerse the junction box or cord in liquids! 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 7 Dry-fired heating elements are not covered under warranty! 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 8: Control Panel Operation

    Water (Palmer & Kaminski) Yeast (Zainasheff and White) Malt (John Mallet) For the Love of Hops (Stan Hieronymus) Brewing Classic Beer Styles (Zainasheff & Palmer) 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 9 Shoot for a 3-5% boil off rate per hour. IMPORTANT: To drive off DMS ALWAYS boil with the lid open! 3.5 BBL Hybrid Brewhouse 2 Vessel V1 © Blichmann Engineering, LLC 2018 For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts...
  • Page 10: Cleaning Your System

    Optional cleaning tools are available through Blichmann Engineering to make this a fast and thorough job. Alternately, you can utilize one of the heated vessels to heat and hold your CIP (clean in place) chemicals and use one pumps to recirculate through the CIP ball and the second pump to return back into the chemical kettle.
  • Page 11 A. Limited Warranty Blichmann Engineering warrants to the original purchaser that this product will be free from manufacturing defects in material and workmanship for a period of one (1) year from the date of purchase by the customer. Proof of purchase is required. Blichmann Engineering’s obligation to repair or replace defective materials or workmanship is the sole obligation of Blichmann Engineering under this limited warranty.