System Start Up; Startup Screen - Lincoln Electric APEX 3 Series Operator's Manual

Tig pendant
Hide thumbs Also See for APEX 3 Series:
Table of Contents

Advertisement

APEX
®
3 SERIES TIG PENDANT MANUAL

System Start Up

Ensure all components are connected. Refer to the
individual component manuals for full connection
instructions.
Prior to beginning the weld, turn on the welding power
supply. The system is designed to be turned on and
off through the welding power supply. Ensure all
components are connected. Refer to the individual
component manuals for full connection instructions.
Note: With power applied to the system, check the
reset button. If the reset button is engaged
the system will not initialize. To disengage the
reset button, rotate the knob clockwise. See
FIGURE 1 - APEX Pendant Reset Button.
FIGURE 1 - APEX Pendant Reset Button
This reset button can be used to restart the system
for troubleshooting purposes and to halt welding and
system movement.

Startup Screen

When the system is reset at the Power Wave
screen will display "Checking Network Connection...
Calibrating System – FIGURE 2 - Startup Screen.
This is a normal part of the initialization process.
Note: During the start up interval, the weld head goes
through a self-calibration cycle. The system will
not allow the user to log in until the calibration
cycle has been completed.
When the system is fully calibrated, the user is pre-
sented with a log in screen – see FIGURE 3 - Log In
Screen. Log in to begin use. See the next sections for
pendant operation.
, the
®
A-12
FIGURE 2 - Startup Screen
FIGURE 3 - Log In Screen
OPERATION

Advertisement

Table of Contents
loading

Table of Contents