Download Print this page

ekwb EK-Quantum Kinetic TBE DDC PWM Series Installation Manual page 14

Pump & reservoir combo

Advertisement

TESTING THE LOOP
To make sure the installation of EK components was
successful, we recommend you perform a leak test for
24 hours.
When your loop is complete and filled with coolant,
connect the pump to a PSU outside of your system. Do not
connect the power to any of the other components.
Turn on the PSU and let the pump run continuously. It is
usual for the coolant level to drop during this process as
air collects in the reservoir.
Inspect all the parts of the loop, and in the case of
coolant leaks, fix the issue, and repeat the testing
process. Ensure that all hardware is dry before the
system is powered on in order to prevent any damage.
- 14 -

Advertisement

loading
Need help?

Need help?

Do you have a question about the EK-Quantum Kinetic TBE DDC PWM Series and is the answer not in the manual?