START-UP

Power Up

When powering up the GroundControl system, use the following recommended sequence:
1) Fixture
2) Truss Box
3) 4-Way Switch (if used). Allow one minute for the 4-Way Switch to boot up.
4) GC Followspot Controller
There is no power on/off switches for the Truss Box or fixture. (Power is automatically applied once the power source
is connected.)
Power up the GC Followspot Controller by switching its power switch to the ON position (Figure 16).
DMX OUT
AC
THRU
DMX IN
AC
POWER
100-240 VAC
50/60 Hz
1A MAX.
Figure 16: GC Controller Power Switch Location