6.2.4 Lay the supply lines

Make sure there is no voltage at electrically operated components before
carrying out work on them!
It is standard that the system has a 3.5 m long 4 mm
longer cables, the cable cross section must be increased by an authorised
workshop:
Cut off the 4 mm
and then make a proper connection to a larger cable cross section. WAECO
recommends a cross section of 6 mm
Fit a fuse of at least 25 amps to the connection with the vehicle's power
supply.
The roof air conditioner must be connected to a battery that is able to sup-
ply the required current (see chapter "Technical data" on page 34).
You can connect the system directly to both the HGV's multiplier and the
battery. However, connection to the multiplier is preferable. Ask your ve-
hicle manufacturer for the specifications of the multiplier.
➤ Lay the supply cable and connect it to the vehicle (red cable to plus
and black cable to minus).
➤ Plug the supply line plug into the socket in the roof air conditioner.
➤ Secure the supply line with a cable binder (see fig. 7 on page 5,
Pos. 1).

6.2.5 Adjust the cover frame

When the system is installed, the outlet unit must be approx. 5 mm above
the cover frame:
➤ Cut the cover frame to suit the specific conbditions of the vehicle (see
fig. 8 on page 5).
2
cable as closely as possible to the device (max. 0.5 m)
2
from lengths of 3.5 m to 6 m.
Installation
2
cable. If you require
29