SUN2000-(50KTL, 60KTL, 65KTL)-M0
User Manual
Installing the PE Cable
Step 1 Crimp an OT terminal.
Step 2 Secure the PE cable using the ground screw.
Figure 5-7 Connecting a PE cable
Step 3 (Optional) To enhance the corrosion resistance of a ground terminal, apply silica
gel or paint around the terminal.
----End
Installing the AC Output Power Cable
Step 1 Remove the locking cap from the AC OUTPUT cable gland and then remove the
plug.
Step 2 Route the cable through the cable gland.
1. Select appropriate rubber fittings based on the outer diameter of the AC power
2. To avoid damaging the rubber fitting, do not route a cable with a crimped OT
3. Adjusting a cable when the thread-lock sealing nut is tightened will shift the
Issue 06 (2020-07-07)
NO TICE
cable to ensure proper sealing.
terminal directly through the rubber fitting.
rubber fitting, which will affect the Ingress Protection Rating of the device.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
42