Installation; Receiving And Storage; Compliance With Codes - Harsco Industrial MACH C1500GG Installation & Owner's Manual

Gas-fired dual fuel boiler natural gas or propane
Table of Contents

Advertisement

3.0 INSTALLATION

agency, or gas supplier.
3.1
R
S
ECEIVING AND
3.1.1 Initial Inspection
Upon receiving the boiler, inspect it for signs of shipping damage. Since some damage may be hidden, we
recommend unpacking the boiler, removing the top, front, and side covers and inspect the boiler. Verify that the total
number of pieces shown on the packing slip agrees with those actually received.
NOTICE! Note any damage, suspected potential damage, or shortage of materials on the freight bill and
immediately notify the carrier. File all claims for shortage or damage with the carrier. Claims for hidden damages
must be filed with your carrier within 7 days. The boiler carton is equipped with a "Tip (N) Tell". If "Tip (N)
Tell" arrow point is blue, that indicates that the package has been on its side or tipped over in transit.
3.1.2 Storage Prior to Installation
If the boiler is not installed immediately, it must be stored in a location adequately protected from the weather and
freezing conditions, preferably indoors. If this is not possible, then it should remain in the shipping container and be
covered by a tarpaulin or other waterproof covering.
NOTICE! Controls and other equipment that are damaged or fail due to weather exposure are not covered by
warranty.
3.2
C
OMPLIANCE WITH
The MACH® Boiler with standard components and with many options complies with American National Standard/CSA
Standard ANSI Z21.13/CSA 4.9, latest edition, Gas-Fired Low Pressure Steam and Hot Water Boilers.
The heat exchanger is constructed and stamped in accordance with ASME Boiler and Pressure Vessel Code, Section
IV for 100 psig maximum operating pressure and/or 200º F maximum temperature.
Installation of the boiler must comply with the requirements of all national, state and local codes established by the
authorities having jurisdiction. Authorities having jurisdiction should be consulted before installations are made.
Within the US, and in the absence of such local requirements, this boiler should be installed using the National Fuel
Gas Code, ANSI Z223.1/NFPA 54, latest edition.
In Canada, the equipment shall be installed in accordance with the current Installation Code for Gas Burning
Appliances and Equipment, CAN/CSA-B149, latest edition and applicable Provincial Regulations for the class, which
should be carefully followed in all cases.
Where required by local codes, the installation must conform to American Society of Mechanical Engineers Safety
Code for Controls and Safety Devices for Automatically Fired Boilers (ASME CSD-1).
In the Commonwealth of Massachusetts (a) this unit must be installed by a licensed pipe fitter / plumber, (b) field
installed gas cocks must be "T" handle type, (c) piping of condensate shall conform to the State Plumbing Code, and
(d) refer to the Massachusetts supplement for further details.
Installation and service must be performed by a qualified installer, service
TORAGE
C
ODES
Page 8
MACH® Gas-Fired Boiler

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mach c2000ggMach c1500Mach c2000

Table of Contents