Distillation System Installation - BÖWE P25 Installation Instructions Manual

Hide thumbs Also See for P25:
Table of Contents

Advertisement

6
Fixing the Machine in Place

6.3 Distillation System Installation

Select the anchoring method to suit the local conditions.
First secure the machine.
Steps for securing the distillation system:
Remove the red shipping brace on the distillation paneling.
D
Push the distillation system over the angle bracket on the machine trough until the angle
bracket (1) and the trough base (2) touch.
The two troughs must be level with one another on the front side (5).
Place connecting pipes between the machine and distillation system for exact alignment.
E
Use the holes (4) of the distillation system anchor as a drilling template.
Drill 12-mm (.5-in)
Use the recesses (6) in the distillation trough to secure the machine (3) and distillation
system (4).
Install the cover rails (7) between the two safety troughs.
22
ø
holes for plugs.
6
6.3
P25/P30