Operating Condition - AOpen CRW1232 PRO Manual

Hide thumbs Also See for CRW1232 PRO:
Table of Contents

Advertisement

CE TEST REPORT
--
phase angle in the case of a.c. power supply;
--
actual installation conditions, for example :
AC : neutral earthed,
DC : ( + ) or ( - ) earthed to simulated the actual earthing conditions.
d.
If not otherwise specified the surges have to be applied synchronized to the voltage phase at the
zero-crossing and the peak value of the a.c. voltage wave ( positive and negative ).
e.
The surges have to be applied line to line and line(s) and earth. When testing line to earth, the test
voltage has to be applied successively between each of the lines and earth, if there is no other
specification.
f.
The test procedure shall also consider the non-linear current-voltage characteristics of the equipment
under test. Therefore the test voltage has to be increased by steps up to the test level specified in
the product standard or test plan.
g.
All lower levels including the selected test level shall be satisfied.
protection, the output voltage of the generator shall be increased up to the worstcase voltage
breakdown level ( let-through level ) of the primary protection.
h.
If the actual operating signal sources are not available, the may be simulated.
circumstances may the test level exceed the product specification.
according the a test plan.
i.
To find all critical points of the duty cycle of the equipment, a sufficient number of positive and
negative test pulses shall be applied. For acceptance test a previously unstressed equipment shall
be used to the protection devices shall be replaced.

12.4 OPERATING CONDITION

Full system
Test Engineer :
SPORTON International Inc.
TEL : 886-2-2696-2468
FAX : 886-2-2696-2255
ROXY CHOU
Report No. : C121401
For testing the secondary
The test shall be carried out
Page Number
: 49 of 62
Issued Date
: Feb. 21, 2001
Under no

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cdrw121032a

Table of Contents