Before You Start - Fluke PQ Window Instructions Manual

Voltage / current measurement feed-through device for electrical enclosures
Table of Contents

Advertisement

Before You Start

Unpack the Product when it arrives. See Figure 1. Identify and
make sure all the parts are in the shipment:
PQ Window Feed-Through Box
Top Plate (installed on )
PQ Window Frame with Cover
Top Plate Decal Set
Screws: x6 flathead (installed) / x6 panhead
Cable Marker Set
Current Test Leads (x4)
A single current test lead is available as an
optional accessory for Loggers that support five
current channels.
Cable Tie Set (not shown)
Instruction Sheet (not shown)
5
4
Figure 1. PQ Window Parts
Note
1
2
6
7
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pq400

Table of Contents