Download Print this page

Festo CPV10-VI-P Series Assembly Instructions page 2

Multi-pin

Advertisement

Available languages

Available languages

1. Parts list
P2
P4
P6
9053d_1
9053d_3
9053d_11
2. Preparing for fitting
9053d_5 und 9053d_12
9053d_2
A _ 0.1
B _ 0.1
C _ 0.1
Type
CPV10-VI-P..-M7-D 1
P2
29
22
40
P4
29
42
40
P6
29
62
40
P8
29
82
40
9053d_4
Type
A _ 0.1
B _ 0.1
C _ 0.1
CPV10-VI-P..-M7-C 2
P2
53
59
64
P4
53
79
64
P6
53
99
64
P8
53
119
64
1 Multi-pin
P8
1
CPV10-VI-P..-M7-D
2 Multi-pin
CPV10-VI-P..-M7-C
3 Seals
CPV10-VI-P.M7
2
3
• Note the dimensions of
the cut-out for fitting (see
table).
In order to comply with
protection class IP65.
• Make sure that the sur-
face near the sealing sur-
face:
– is flat.
– is free of marks and scrat-
ches.
Mounting cut-out for
CPV10-VI-P..-M7-D 1
D _ 0.1
N
8
2
28
4
48
6
68
6
Mounting cut-out for
CPV10-VI-P..-M7-C 2
D _ 0.1
N
62
6
82
6
102
6
122
6
Assembly instructions (en)
688 719 / 2006-06NH
Multi-pin
CPV10-VI-P..
3. Fitting
9053d_6
9053d_7
9053d_8
l – t = > 7.5mm < 9.5 mm
9053d_9
M
= 4.5 – 5.5 Nm
9053d_10
A
†‡
Festo AG & Co. KG
Postfach
73726 Esslingen
++49/(0)711/347-0
www.festo.com
• Press all the seals 3
supplied into the holes in
the CPV valve terminal.
• Note that the 3 and 4-part
3
seals supplied with the
end plates of the CPV
valve terminal are only re-
quired with Multi-pin 2
type CPV10-...-C.
• Place the Multi-pin 1 or
2 in the mounting cut-out
from inside.
1 / 2
• Fasten the Multi-pin 1 or
2 with N x M5 corrosion-
1 / 2
resistant screws as per
DIN EN ISO 4762.
• Select the screw length l
as follows. A screw depth
of at least 7.5 mm to max.
9.5 mm must be guaran-
teed.
• Tighten screws. Note here
the permitted tightening
torque.

Advertisement

loading

This manual is also suitable for:

Cpv10-vi-p2-1/8-cCpv10-vi-p2-m7-cCpv10-vi-p2-m7-dCpv10-vi-p4-1/8-cCpv10-vi-p4-m7-cCpv10-vi-p4-m7-d ... Show all