PRELIMINARY INSTALLATION
INSTALLATION CONSIDERATIONS
Prior to installing the Series 700A/VS, be sure to take into consideration the site you have selected.
Power Conditioners produce heat and therefore require ventilation as well as accessibility. Consider
these factors.
Ventilation
Size of the Power Conditioner
Weight Load
Audible Noise Requirements
Remote Emergency Power Off (Repo)
Monitors
Options
Clean Environment
CHOICE OF LOCATION
The unit has been completely inspected and extensively tested under various load conditions prior to
shipment. Care to install it at a proper location will assure long trouble-free operation.
The unit has been completely inspected and extensively tested under various load conditions prior
to shipment. Care to install it at a proper location will assure long trouble-free operation. The unit is
air cooled with the air intake at the bottom and exhausts at the top, front or at the sides. Therefore,
it should be installed in a clean, dry place with enough clearance to allow a free flow of air. Allow at
least 4 inches of space between the unit and the wall or other equipment. Allow enough space for
maintenance on all four sides of the unit.
Proper Ground Techniques
Input Source Voltage
Receiving Facilities
Distribution of Power
Room Temperature
Clearances
Accessibility
Excessively Long Power Runs
9