PRELIMINARY INSTALLATION

INSTALLATION CONSIDERATIONS
Prior to installing the Series 700A/VS, be sure to take into consideration the site you have selected.
Power Conditioners produce heat and therefore require ventilation as well as accessibility. Consider
these factors.
ƒ Ventilation
ƒ Size of the Power Conditioner
ƒ Weight Load
ƒ Audible Noise Requirements
ƒ Remote Emergency Power Off (Repo)
ƒ Monitors
ƒ Options
ƒ Clean Environment
CHOICE OF LOCATION
The unit has been completely inspected and extensively tested under various load conditions prior to
shipment. Care to install it at a proper location will assure long trouble-free operation.
The unit has been completely inspected and extensively tested under various load conditions prior
to shipment. Care to install it at a proper location will assure long trouble-free operation. The unit is
air cooled with the air intake at the bottom and exhausts at the top, front or at the sides. Therefore,
it should be installed in a clean, dry place with enough clearance to allow a free flow of air. Allow at
least 4 inches of space between the unit and the wall or other equipment. Allow enough space for
maintenance on all four sides of the unit.
ƒ Proper Ground Techniques
ƒ Input Source Voltage
ƒ Receiving Facilities
ƒ Distribution of Power
ƒ Room Temperature
ƒ Clearances
ƒ Accessibility
ƒ Excessively Long Power Runs