Preventive Maintenance - Infinite TRANSTECTOR 700 AV/T Series Owner's Manual

60 k(i) power conditioner with voltage regulation (60 hz)
Table of Contents

Advertisement

Quadruple Output Power Conditioner | Owners Manual

PREVENTIVE MAINTENANCE

DANGER OF ELECTRICAL SHOCK, TURN OFF ALL POWER SUPPLYING THIS EQUIPMENT
To ensure longer component life and trouble-free operation, minor preventive maintenance procedures should be
performed at regular intervals, for example once every year. More frequent inspection intervals would be needed
To ensure longer component life and trouble-free operation, minor preventive maintenance procedures
for more severe operating conditions and larger number of hours of continuous operation.
should be performed at regular intervals, for example once every year. More frequent inspection
intervals would be needed for more severe operating conditions and larger number of hours of
A.
Remove top and side panels and at each service inspection any accumulated dust, dirt or foreign
continuous operation.
particles should be carefully removed. Special care should be exercised in cleaning the thyristors,
heat sinks and the control assembly.
A. Remove top and side panels and at each service inspection any accumulated dust, dirt
or foreign particles should be carefully removed. Special care should be exercised in
B.
Inverse Parallel Silicon Rectifiers (SCR's) or Thyristors
cleaning the thyristors, heat sinks and the control assembly.
The silicon controlled rectifiers (SCR's) usually fail in the shorted mode. When this happens,
B. Inverse Parallel Silicon Rectifiers (SCR's) or Thyristors
normally the fusible link in series with the SCR will be blown open to clear the short and prevent
damage to the transformers. If a blown SCR is suspected, contact Transtector for service.
The silicon controlled rectifiers (SCR's) usually fail in the shorted mode. When this
C.
A simple performance checklist has been developed for use in maintenance. See Pages 26 and 27
happens, normally the fusible link in series with the SCR will be blown open to clear the
and check off items 1-8.
short and prevent damage to the transformers. If a blown SCR is suspected, contact
D.
After items 1-8 have been checked on the performance checklist, the next step is to check the
Transtector for service.
operation of the system.
C. A simple performance checklist has been developed for use in maintenance. See Pages
E.
Replace top and side panels. Turn unit on with no load. Check item 9 on the performance checklist.
19 and 20 and check off items 1-8.
F.
Turn on loads and check items 10-13 of the performance checklist on pages 26 and 27.
D. After items 1-8 have been checked on the performance checklist, the next step is to check
the operation of the system.
NOTE: Preventive Maintenance Plans are available. Please contact the Customer Support Group for
information.
E. Replace top and side panels. Turn unit on with no load. Check item 9 on the performance
checklist.
F. Turn on loads and check items 10-13 of the performance checklist on pages 19 and 20.
NOTE: Preventive Maintenance Plans are available. Please contact the Customer Support Group for
information. Call +1 208.762.6112 or 1-800-882-9110 X 6112.
|
/v
PREVENTIVE MAINTENANCE
***WARNING***
PRIOR TO MAINTENANCE.
Call 1-800-882-9110 X 6112.
PAGE 25
18

Advertisement

Table of Contents
loading

Table of Contents