START-UP
THERE ARE DANGEROUSLY HIGH VOLTAGES PRESENT WITHIN THE ENCLOSURE OF THE POWER
SUPPLY SYSTEM. CAUTION MUST BE TAKEN WHEN WORKING WITH THE ENCLOSURE. IT IS
RECOMMENDED THAT ALL WORK BE PERFORMED BY QUALIFIED ELECTRICAL PERSONNEL ONLY.
NOTE: INITIAL START-UP SHOULD BE PERFORMED WITH NO LOAD ON SYSTEM.
NOTE: INITIAL START-UP SHOULD BE PERFORMED WITH NO LOAD ON SYSTEM.
1. Re-install all panels that may have been removed during installation.
1.
Re-install all panels that may have been removed during installation.
2. Make sure the input circuit breaker is in the off position.
3. Energize the primary building power.
2.
Make sure the input circuit breaker is in the off position.
4. Turn on the main AC input breaker.
3.
Energize the primary building power.
5. Verify that the output voltage is within the specified range.
4.
Turn on the main AC input breaker.
6. Verify output phase rotation is correct.
7. Turn the system off.
5.
Verify that the output voltage is within the specified range.
8. Connect the loads one at a time and repeat Step 4.
6.
Verify output phase rotation is correct.
7.
Turn the system off.
8.
Connect the loads one at a time and repeat Step 4.
START - UP
***WARNING***
PAGE 24
17