Installation; Siting - Calorex Pro-Pac Series Owners & Installation Manual

Hide thumbs Also See for Pro-Pac Series:
Table of Contents

Advertisement

Available languages

Available languages

PR0-PAC SYSTEM OWNER INSTALLATION MANUAL

INSTALLATION.

1. SITING

NOTE: These units are not recommended for plant room installation.
1.
Ensure heat pump on site is as ordered, i.e. model, electrical supply and
factory fitted options.
2.
Inspect unit for damage, in particular inspect the evaporator (finned
side) to ensure that it is undamaged. (Minor indentations in the fins do
not affect performance). If severely damaged, endorse delivery note in
presence of the driver and send a recorded delivery letter to transport
company giving details.
3.
Protect unit if installation is delayed.
4.
Provide a firm level base capable of supporting operational weight of unit;
spread load on timber floor.
5.
Ensure water cannot collect under unit - recommend units are installed
on plinth 100mm above finished floor level and also to aid condensate
drainage.
6
6.
7.
8.
9.
IMPORTANT NOTE
Lift the unit into place using a fork lift truck, or similar lifting device, if lifting the unit from
above spreader bars must be used to avoid any pressure on the sides of the unit or
packing materials.
DO NOT PUSH OR DRAG THE UNIT ALONG THE GROUND.
Allow adequate clearance to service panels on unit; recommend 500mm
minimum (see installation drawings).
All Calorex heat pumps are by design as quiet as is practical, however
due consideration should be given to siting in order to fully exploit
this feature, i.e. ensure that the inlet and outlet grilles face away from
occupied premises.
Ensure loose debris such as leaves, grass cuttings, etc will not block air
inlet filters or grilles.
Consider protection from extreme weather conditions.
SD566252 ISSUE 51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents