Riello RTC-80 Series Installation, Operation And Service Manual page 31

Table of Contents

Advertisement

Multiple Boiler Piping with Primary and Secondary Piping
SP
FLOW
2
FLOW
2
FLOW
2
1
Boiler
2
Burner
3
Isolation valves
4
Central heating system pump
5
Non-return valves
6
Automatic vent valve
7
Boiler safety valve
8
Boiler drain valve
9
Y strainer
10
Pressure reducer
11
Expansion tank
12
Water softener filter
13
Siphon
14
Condensate outlet
7
LT
RETURN (**)
1
3
7
LT
RETURN (**)
1
3
7
LT
RETURN (**)
1
3
14
4
4
4
15
15
15
Drain
16
Isolation valve
17
Non-return valve
18
Mixer tank
19
Pressure gauge
SP
Sequencing panel
TC
Control temperature
. _ . _ . Electrical signal
(*)
LT= Low Temperature/HT= High Temperature
(**)
On the RTC 1000-80 to RTC 4700-80 the low
temperature heating return is located on the top
of the boiler. See "Single Boiler Piping Schematic
Type A".
31
6
MAKE-UP
10
3
WATER
5
3
3
3
CENTRAL
HEATING
SUPPLY
3
9
TC
3
11
LT (*) CENTRAL
HEATING
RETURN
19
10
12
3
3
WATER
INLET
INSTALLATION
3
5
4
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents