Riello RTC-80 Series Installation, Operation And Service Manual page 30

Table of Contents

Advertisement

INSTALLATION
Multiple Boiler Piping Schematic with Sequencing Panel
SP
FLOW
2
FLOW
2
FLOW
2
1
Boiler
2
Burner
3
Isolation valves
4
Central heating system pump
5
Non-return valves
6
Automatic vent valve
7
Boiler safety valve
8
Boiler drain valve
9
Y strainer
10
Pressure reducer
11
Expansion tank
12
Water softener filter
13
Siphon
14
Condensate outlet
15
Drain
LT (*)
CENTRAL
HEATING
RETURN
7
HT
RETURN
1
LT
RETURN (**)
3
7
HT RETURN
1
16
LT
RETURN (**)
3
7
HT RETURN
1
16
LT
RETURN(**)
3
8
15
HT (*)
6
3
CENTRAL
HEATING
3
RETURN
18
3
3
14
15
16
Isolation valve
17
Non-return valve
18
Air separator
19
Motorized isolation valve
20
Pressure gauge
SP
Sequencing panel
TC
Control temperature
. _ . _ . Electrical signal
(*)
LT= Low Temperature/HT= High Temperature
(**)
On the RTC 1000-80 to RTC 4700-80 the low
temperature heating return is located on the top
of the boiler. See "Single Boiler Piping Schematic
Type A".
30
10
5
MAKE-UP
3
WATER
CENTRAL
3
5
HEATING
4
4
SUPPLY
TC
3
9
3
11
20
10
3
3
12
WATER
INLET

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents