S16 INSTALLATION INSTRUCTION
1. See Receiving The Air Conditioner and Handling and Testing The Air Conditioner on page 9.
2. Using the cutout template provided with the unit, prepare the enclosure. See Figure 16 and Figure
17. The front of the unit requires a half meter clearance for proper ��� . Five centimeters is
required on each side of the unit. To avoid condensate ov��� , unit must be mounted within 3° of
level.
3. Refer to mounting instructions on page 11.
4. Adjust controller to desired cabinet temperature. Refer to Displaying and Changing Program
Variables on page 16 for controller adjustment and operation.
62.19
1580
.375
(10)
Surface Mount
C-NET INDUSTRIAL LTD. | +44(0)121 544 8608 | INFO@CNET-IS.CO.UK | WWW.CNET-IS.CO.UK
- 58 -
14.00
12.44
356
316
25.63
651
12.19
9.44
310
240
21.83
554
11.02
280
(5)
10
15.75
400
S16 2000/2500W Cutout Drawing
Dashed Lines Represent The Air Conditioner
.625
R16
(4)
14.96
380
(2)
14.88
378
21.65
550
(2)
62.19
1580
12.80
325
(2)
10.82
275
(2)
14.56
370
.375
(2)
10
(4)
15.75
400
Partial and Full Recess Mount
Figure 16
61.34
60.69
1558
1542
(2)
.33
8
89116616