2.2.1 Flowmeter Primary Installation

The electromagnetic flowmeter can be installed at any arbitrary
location in the pipeline as long as the installation requirements
(see 2.2) are satisfied.
When selecting the installation site, consideration should be
given to assure that moisture cannot enter into the electrical
connection or converter areas. Make certain to carefully seat
the gaskets and secure the covers after installation and start-up
have been completed.
Note:
Graphite should not be used to lubricate the flange
or process connection gaskets because under certain
circumstances an electrically conductive coating may
form on the inside surface of the meter tube affecting
operation. Vacuum shocks in the pipeline should be
avoided to prevent damage to the liner (PTFE Liners).
Gasket Surfaces on the Mating Flanges
In every installation parallel mating flange surfaces should be
provided and gaskets made from materials suitable for the fluid
and the temperature should be installed. Only then can leaks be
avoided. The flange gaskets for the flowmeter primary must be
installed concentrically to achieve optimum measurement re-
sults.
Protection Plates
The protection plates are installed to prevent damage to the
flowmeter primary liner during transport. Remove the protection
plates only when ready to install the meter in the pipeline. Be
careful not to cut or otherwise damage the liner in order to
prevent leakage.
Torque Specifications for Flanges
The mounting bolts are to be tightened equally in the usual
manner without excessive one-sided tightening. We recom-
mend that the bolts be greased prior to tightening and that they
be tightened in a criss-cross pattern as shown in Fig. 10.
Tighten the bolts during the first pass to approx. 50 %, during
the second pass to approx. 80 % and only during the third pass
to 100 % of the max. torque value. The max. torque values
should not be exceeded, see the following tables.
Fig. 10
Electromagnetic Flowmeter
Torque Specifications for Flanged Meters
Liner
Meter Size
inch
DN
Connection
PTFE/
1/8-1/4 3-10
Flanged
Hard rubber
1/2
15
(≥ 1/2"
3/4
20
[DN 15])
1
25
1-1/4
32
ETFE
1-1/2
40
(≥ 1"
2
50
[DN 25])
2-1/2
65
3
80
PFA
4
100
Flanged,
≤ 10"
5
125
Wafer
[DN 250]
6
150
Design
PTFE/
8
200
(≤ 4"
Hard rubber
10
250
[DN 100])
ETFE
12
300
≤ 12"
14
350
[DN 300]
16
400
PTFE
20
500
Flanged
≤ 32"
24
600
[DN 800]
28
700
Hard rubber
32
800
36
900
40
1000
Table 1
Torque Specifications for Wafer Design Flowmeters
Liner
Meter Size
Process
inch
mm
Connection
PFA
1/8-1/4 3 - 6
Threaded
flanges
Wafer Design
3/8
10
1/2
15
3/4
20
1
25
Threaded
PFA/
1-1/4
32
flanges
PTFE
1-1/2
40
Wafer Design
2
50
2-1/2
65
3
80
4
100
Table 2
COPA-XE / MAG-XE
Process
Bolts
Torque
max. Nm
4 x M12
4 x M12
10
4 x M12
16
4 x M12
21
4 x M16
34
4 x M16
43
4 x M16
56
8 x M16
39
8 x M16
49
8 x M16
47
8 x M16
62
8 x M20
83
12 x M20
81
12 x M24
120
12 x M24
160
16 x M24
185
16 x M27
250
20 x M24
200
20 x M27
260
24 x M27
300
24 x M30
390
28 x M30
385
28 x M33
480
Bolts
Torque
max. Nm
4 x M12
2.3
4 x M12
7.0
4 x M12
7.0
4 x M12
11.0
4 x M12
15.0
4 x M16
26.0
4 x M16
33.0
4 x M16
46.0
8 x M16
30.0
8 x M16
40.0
8 x M20
67.0
PN
bar
8
40
40
40
40
40
40
40
40
40
16
16
16
16
16
16
16
16
10
10
10
10
10
10
PN
bar
40
40
40
40
40
40
40
40
40
40
40
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mag-xe

Table of Contents