General Information; About The Unit; Unit Inspection; Exterior Inspection - Trane Voyager Commercial Installation, Operation And Maintenance Manual

Packaged rooftop air conditioners with reliatel controls and estage 27.5 to 50 tons - 60 hz, 22.9 to 41.7 tons 81-148 kw - 50 hz
Hide thumbs Also See for Voyager Commercial:
Table of Contents

Advertisement

General Information

About the Unit

Overall unit dimensional data is illustrated in
Dimensions and Weights," p.
unit ships fully assembled and charged with the proper
refrigerant quantity from the factory. They are
controlled by a microelectronic unit control processor.
Several solid state modules are grouped to form the
"Control System". The number of modules within any
given control system will be dependent upon the
options and accessories ordered with the unit.
Acronyms are used extensively throughout this manual
when referring to the "Control System".
Basic unit components include:
Scroll compressors
One (1) Intertwined Evaporator Coil
One (1) Supply Fan
Three (3) to Four (4) Condenser Fans
Microchannel Condenser Coils
Filters (type is dependent on option selection)

Unit Inspection

To protect against loss due to damage incurred in
transit, perform inspection immediately upon receipt of
the unit.

Exterior Inspection

If the job site inspection reveals damage or material
shortages, file a claim with the carrier immediately.
Specify the type and extent of the damage on the bill of
lading before signing. Notify the appropriate sales
representative.
I I m m p p o o r r t t a a n n t t : : Do not proceed with installation of a
damaged unit without sales
representative's approval.
Visually inspect the complete exterior for signs of
shipping damages to unit or packing material.
Verify that the nameplate data matches the sales
order and bill of lading.
Verify that the unit is properly equipped and there
are no material shortages.
Verify that the power supply complies with the unit
nameplate specifications.
Inspection for Concealed Damage
Visually inspect the components for concealed damage
as soon as possible after delivery and before it is
stored.
Do NOT walk on the sheet metal base pans. Bridging
between the unit's main supports may consist of
multiple 2 by 12 boards or sheet metal grating.
12
"Unit
13. Each package rooftop
W W A A R R N N I I N N G G
N N o o S S t t e e p p S S u u r r f f a a c c e e ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w i i n n s s t t r r u u c c t t i i o o n n b b e e l l o o w w c c o o u u l l d d r r e e s s u u l l t t i i n n
d d e e a a t t h h o o r r s s e e r r i i o o u u s s i i n n j j u u r r y y . .
D D o o n n o o t t w w a a l l k k o o n n t t h h e e s s h h e e e e t t m m e e t t a a l l d d r r a a i i n n p p a a n n . . W W a a l l k k i i n n g g
o o n n t t h h e e d d r r a a i i n n p p a a n n c c o o u u l l d d c c a a u u s s e e t t h h e e s s u u p p p p o o r r t t i i n n g g m m e e t t a a l l
t t o o c c o o l l l l a a p p s s e e a a n n d d r r e e s s u u l l t t i i n n t t h h e e o o p p e e r r a a t t o o r r / / t t e e c c h h n n i i c c i i a a n n
f f a a l l l l i i n n g g . .
If concealed damage is discovered:
Notify the carrier's terminal of the damage
immediately by phone and by mail.
Concealed damage must be reported within 15
days.
Request an immediate, joint inspection of the
damage with the carrier and consignee.
Stop unpacking the unit.
Do not remove damaged material from receiving
location.
Take photos of the damage, if possible.
The owner must provide reasonable evidence that
the damage did not occur after delivery.

Repair

Notify the appropriate sales representative before
arranging unit installation or repair.
I I m m p p o o r r t t a a n n t t : : Do not repair unit until the damage has
been inspected by the carrier's
representative.

Storage

Store unit in a level and dry location. Use adequate
blocking under the base rail. If unit is not level and
supported adequately, damage may occur when
removing screws and opening doors.
Take precautions to prevent condensate formation
inside the unit electrical components and motors when:
The unit is stored before it is installed; or,
The unit is set on the roof curb and temporary
auxiliary heat is provided in the building.
Isolate all side panel service entrances and base pan
openings (e.g., conduit holes, S/A and R/A openings,
and flue openings) to minimize ambient air from
entering the unit until it is ready for startup.
N N o o t t e e : : Do not use the unit heater as temporary heat
without completing the startup procedures
detailed under Startup information.
The manufacturer will not assume responsibility for
equipment damage resulting from accumulation of
condensate on the unit electrical components.
RT-SVX34R-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents