Download Print this page

Removal Of Electrical Box - Daikin 2AMK40FV1B Service Manual Removal Procedure

Outdoor unit 4.0/5.0 kw class

Advertisement

Removal of Electrical Box

2. Removal of Electrical Box
Procedure
Step
1. Disconnect the
connecting wires.
1
Remove the 2 screws
of earth wires.
Remove the 2 screws
and remove the wiring
fixture.
Then remove all the
screws to disconnect
the power supply
cables and the
connecting wires.
2. Remove the electrical
box.
1
Release the outdoor
temperature thermistor.
Lift up the guard net
2
and remove it.
4
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Room A
4
4
P
Wiring
fixture
Outdoor temperature thermistor
Guard net
When reassembling, fasten
the wires with screws on the
terminal board.
Room B
Power supply
Screw of
earth wire
(R7573)
(R7208)
(R7209)
Si12-891
Points
Removal Procedure

Advertisement

loading