4
Step 4
Insert the end rails into the
desktop frame cross section.
5
Step 5
Insert the right leg into the frame
and use 4 of the bolts supplied to
fix into place.
6
Step 6
Insert the left leg at a 45° angle
before fixing the leg in its upright
position with the other 4 bolts
provided.
Need help?
Do you have a question about the Elev82 Mono Single Desk EVM-1200 and is the answer not in the manual?