General Information; Receiving The Machine; Checks; Purpose Of This Manual - Daikin EWAD E-SS Series Installation, Operation And Maintenance Manual

Air-cooled single circuit screw chiller
Table of Contents

Advertisement

General Information

The units described in the present manual represent a high value investment, maximum care should be taken to
ensure correct installation and appropriate working conditions.
Installation and maintenance must be performed by qualified and specifically trained personnel only.
Correct maintenance of the unit is indispensable for its safety and reliability. Manufacturer's service centres are the
only having adequate technical skill for maintenance.
This manual provides information about the features and standard procedure for the complete series.
All units are delivered from the factory complete with wiring diagrams and dimensional drawings including size and
weight for each model.
WIRING DIAGRAMS AND DIMENSIONAL DRAWINGS MUST BE CONSIDERED ESSENTIAL DOCUMENTS OF
THIS MANUAL
In case of any discrepancy between this manual and the equipment's document please refer to the wiring diagram
and dimensional drawings.

Receiving the machine

The machine must be inspected for any possible damage immediately upon reaching its final place o f installation. All
components described in the delivery note must be carefully verified and checked; any damage must be reported to the
transporter. Check on the machine nameplate, before connecting it to earth, that the model and power supply voltage are
as ordered. Responsibility for any damage after acceptance of the machine cannot be attributed to the manufacturer.

Checks

Please perform the following checks upon receipt of the machine, for your protection in the event that it is incomplete
(any missing parts) or has incurred damage during transport:
a)
Before accepting the machine, please verify every single component in the consignment. Check for any
damage.
b)
In the event that the machine has been damaged, do not remove the damaged material. A set of photo graphs
are helpful in ascertaining responsibility.
c)
Immediately report the extent of the damage to the trasnporter and immediately request that they inspect the
machine.
d)
Immediately report the extent of the damage to the manufacturer representative, so that arrangements can be
made for the required repairs. In no case must the damage be repaired before the machine has been inspected
by the representative of the transportation company.

Purpose of this Manual

The purpose of this Manual is to allow the installer and the qualified operator to carry out all required operations in order
to ensure proper installation and maintenance of the machine, without risking any damage to people, animals and/or
objects.
This Manual is an important supporting document for qualified personnel but it is not intended to replace such personnel.
All activities must be carried out in compliance with local laws and regulations.
D–EIMAC00708-16EN - 6/76
ATTENTION
ATTENTION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents