GENERAL INFORMATION

All units are delivered with wiring diagrams, certified drawings, nameplate; and DOC (Declaration
Of Conformity); these documents show all technical data for the unit you have bought and they
MUST BE CONSIDERED ESSENTIAL DOCUMENTS OF THIS MANUAL
In case of any discrepancy between this manual and the equipment's documents please refer to on board documents. In
case of any doubt contact the manufacturer representative.
The purpose of this manual is to allow the installer and the qualified operator to ensure proper installation, commissioning
and maintenance of the unit, without any risk to people, animals and/or objects.
3

RECEIVING THE UNIT

The unit must be inspected for any possible damage immediately upon reaching final place of installation. All comp onents
described in the delivery note must be inspected and checked.
Should the unit be damaged, do not remove the damaged material and immediately report the damage to the transportation
company and request they inspect the unit..
Immediately report the damage to the manufacturer representative, a set of photographs are helpful in recognizing
responsibility.
Damage must not be repaired before the inspection of the transportation company representative.
Before installing the unit, check that the model and power supply voltage shown on the nameplate are correct.
Responsibility for any damage after acceptance of the unit cannot be attributed to the manufacturer.