Installation - Toro 41228 Installation Instructions Manual

Foam marker kit for multi-pro 1200, 1250, 5600 and 5700 turf sprayers and workman 200 spray systems
Table of Contents

Advertisement

Installation

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
Separate instructions for the installation of the Foam
Marker kit are denoted in each step of the Setup
where specific procedures deviate from one machine
to another. Please look for the heading describing
instructions specific to the machine you are working
with before proceeding with each step of the Setup.
Description
Tank/compressor assembly
Supply hose, 108 inches
Multi-Pro 1200 series adapter bracket
Workman adapter bracket
Mud flap
Mud flap bracket
Bolt (3/8 x 1 inch)
Flange locknut, serrated (3/8 inch)
Locknut (3/8 inch)
Carriage bolt, (3/8 x 1-1/4 inches)
Flange locknut, non-serrated (3/8 inch)
Flange bolt (5/16 x 3/4 inch)
Lock nut (5/16 inch)
Flat washer (3/8 inch)
Hose clamp, small
Bolt (3/8 x 1 inch)
Locknut (3/8 inch)
Mixer assembly
Flat washer (3/8 inch)
Wiring harness
Hose clamp, small
Plastic ties
Rocker switch
Fuse, 15-amp
Boom hose
Grommet
Punched-hole boom cap
Extension hose
Hose clamp, large
Parts catalog
Qty.
1
2
1
1
1
1
4
2
Install the tank, compressor and mixer.
1
4
4
3
3
4
2
1
1
Install the mixer tee.
1
2
1
6
Wire the kit.
12
2
Install the switches and fuse.
1
2
2
2
Complete the installation
2
2
1
2
Use

Advertisement

Table of Contents
loading

Table of Contents