Mitsubishi Electric PUHY-P250YNW-A Service Handbook page 126

Hide thumbs Also See for PUHY-P250YNW-A:
Table of Contents

Advertisement

[6-5 Initialization Procedure for System Rotation Settings ]
3) Switch SW9 to "Local" on all the units and run all units other than control unit (IC1) via remote
controller.
Then run control unit (IC1) in test run mode, and switch SW9 to "Normal" on all the units.
4) Within 3 minutes, backup unit will automatically stop.
BS_06_C
9
chapter 6 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Puhy-p500ysnw-aPfd-p250vm-ePfd-p500vm-e

Table of Contents