Download Print this page

Vision Fitness X6600HRT Assembly Manual page 7

Commercial elliptical trainer
Hide thumbs Also See for X6600HRT:

Advertisement

PINK BAG
3
STEP
• Connect the right dual-action arm to
the right console mast rotation housing,
being sure to line up the holes. Secure
the dual-action arm in place with four
screws (M8x20L) and tighten with the
6mm T-handled wrench. Snap the
dual-action end cap into place.
• Make sure the spacers are insert-
ed into the outside holes of the ball
and socket joint of the lower link
arm. Connect the right lower link
arm to the right dual-action arm by
lining up the holes on the end of
each
arm.
Slide
the
screw
(M10x50L) through the hole. Place
Fig. A
a nut (M10) on the screw and tighten
using the 17mm socket wrench and
6mm T-handled wrench.
• Position the link arm cover over
3
the joint of the lower link arm and
Dual-Action
STEP
dual-action arm. With a screw
Arm
(M5x12L) and the screwdriver, con-
nect the two halves of the cover
Dual-Action
through the hole located in the front
End Cap
of the cover. Attach the cover to
Rotation
each side of the lower link arm with
Housing
the two washers (M5) and two
screws (M5x12L).
• Repeat these same steps on the
Link Arm
left side.
Cover
Fig. A
7

Advertisement

loading