2. To adjust the toe-in, remove the cotter pin and
the nut from either tie-rod ball joint
Figure 96
1. Tie-rod clamp
3. Remove the tie-rod ball joint from the axle case
support.
4. Loosen the clamps at both ends of the tie rods
(Figure
96).
5. Rotate the detached ball joint inward or outward
1 complete revolution.
6. Tighten the clamp at the loose end of the tie rod.
7. Rotate the entire tie-rod assembly the same
direction (inward or outward) 1 complete
revolution.
8. Tighten the clamp at the connected end of the
tie rod.
9. Install the ball joint in the axle case support and
tighten the nut finger tight.
10. Measure the toe-in.
11. Repeat the procedure if necessary.
12. Tighten the nut and install a new cotter pin when
the adjustment is correct.
(Figure
96).
g009718
2. Tie-rod ball joint
Cooling System
Maintenance
Servicing the Engine
Cooling System
Service Interval: Before each use or daily
Remove debris from the engine area, oil cooler, and
radiator daily. Clean them more frequently in dirty
conditions.
1. Unlatch and swing open the rear screen
97).
1. Rear screen latch
2. Clean the screen thoroughly of all debris.
Note:
To remove the screen, lift off the hinge
pins.
3. Clean both sides of the oil cooler/radiator area
(Figure
98) thoroughly with compressed air.
Start from the front and blow the debris out
toward the back. Then clean from the back
side and blow toward the front. Repeat the
procedure several times until all chaff and debris
is removed.