Delta BX6.3 AC Series Operation And Installation Manual page 30

Battery storage system
Table of Contents

Advertisement

Installation
Assemble the AC plug and wires as the procedures shown in Figure 3-12.
The AC wire must be connected to the AC plug according to the correct sequence.
The AC voltage should be L-N 230 Vac ± 10%.
1. Fixed this part
4. Insert the wires
5. Tighten the screws to
L(Grid)
PE
L(Load)
Inverter
7. Connect the AC plug
to inverter
2. Rotate to loosen
the AC plug
Cable
fixed the wires.
.
N(Grid)
N(Load)
8. Rotate to tighten the plug
Figure 3-12 : AC plug illustration for BX6.3_AC
3. Depart the AC plug.
6. Reassemble the AC plug
Align the biggest latch of the AC plug and socket
Socket
Cable
9. Rotate the gland to
fix wires
30
Cable
AC plug

Advertisement

Table of Contents
loading

Table of Contents