Download Print this page
Delta BX6.3 AC100 Quick Installation Manual
Delta BX6.3 AC100 Quick Installation Manual

Delta BX6.3 AC100 Quick Installation Manual

Hide thumbs Also See for BX6.3 AC100:

Advertisement

Quick Links

BX6.3_AC100 user manual
For more instruction and specification, please scan QR-code to see user manual.
> Battery > BX6.3_AC100 Operation and Installation Manual
https://mydeltasolar.deltaww.com/?p=product_manual
Descriptions of Components
Object
Qty
Description
1
Delta BX6.3_AC100
1
Residential AC ESS
The Instruction to provide the information of safety,
2
Quick Installation Guide
1
Installation and specification.
3
WiFi antenna
1
2.4 Ghz Wi-Fi Antenna (IPX7)
4
Antenna Bracket
1
To support Wi-Fi antenna on BX6.3_AC100
5
Rubber cover
1
Protective cover for non-critical waterproof and dust prevent
6
Plastic cover
3
Protective cover for non-critical waterproof and dust prevent
7
AC Plug
1
Connector for AC connection
8
Wiring Cover
2
Protective cover to prevent users from touching the power cable
9
Current sensor
1
120A current transformer
10
CT cable
1
Cable for CT connection
11
H4 Wrench
2
To disconnect H4 connector
Dimensions and Interface Overview
unit: mm
BT-
BT+
Push
Battery
Button
Earth
Ex Comm.
Please refer to the direction shown as the figure
to install the communication module.
* Wi-Fi reset button function
Operation
Wi-Fi LED Status
Wi-Fi LED flashing once
Push 3s~10s
every half a second
Push 10s~20s
No flash
Wi-Fi LED flashing once
Push 20s~
every one seconds
Quick Installation Guide
Battery Storage System
BX6.3_AC100
570
It is prohibited to open the front door.
It may cause failure and the warranty
will void once the door is opened.
Wi-Fi Reset *
AC Output
RS-485 / DRM /
Dry contact / CT port
Explanation
Reset Wi-Fi module
No function
Reset Wi-Fi module, and Wi-Fi password
returns to the default: DELTASOL
Do not open this product or insert tools due to shock and fire hazard which may cause injury.
When installing this product you must adhere to the following instructions:
● The product is intended to be installed and operated by qualified personnel or service personnel only.
● Do not power up the device before installation is complete.
● All circuit breakers must be in the OFF position before commencing installation.
● Do not install BX6.3_AC100 near or on flammable surfaces.
● Please mount BX6.3_AC100 tightly on a solid / smooth surface.
● Install BX6.3_AC100 in a location that prevents damage from flooding.
● Do not expose BX6.3_AC100 to ambient temperatures above 60°C or below -20°C.
● Operating or storing BX6.3_AC100 in temperatures outside its specified range might cause damage
to BX6.3_AC100.
Danger to life through electric shock
Potentially fatal voltage is applied to the unit during operation.
This voltage persists even 60 seconds after disconnection of the power supply.
Never open the unit.
The unit contains no components that must be maintained or repaired by the operatoror installer.
Opening the housing will void the warranty.
60 seconds
To establish a successful communication between Inverter Wi-Fi to MyDeltaSolar Cloud, in the Wi-Fi
connection setup page, the signal strength must be above -70dBm between each Wi-Fi device (Wi-Fi
router, inverter, DC1...etc.). In case the signal strength is below -70dbm, it may cause certain
communication errors which may prevent a successful Wi-Fi communication. To avoid such issues,
Please adjust the Wi-Fi device position to improve the signal strength/quality.
LED Indicators
LED
Grid
SPS
(Stand-alone Power System)
Comm.
Grid / SPS
Push Button
Status
BX6.3_AC100 power OFF
BX6.3_AC100 power OFF
BX6.3_AC100 power ON already
Installation
250
100 mm
* Please refer to regulation AS/NZS 5139:2019 for detail installation space requirement.
To avoid extra fireproof cement sheeting installation requirement, it is recommended to keep at least 300mm
between the wall and BX.
COMM.
Warning
LED Status
GREEN ON
GREEN FLASH 1s ON/OFF
GREEN FLASH 0.1s ON/OFF
RED ON
GREEN ON
GREEN FLASH
RED ON
RED FLASH
GREEN ON
OFF
GREEN FLASH
Grid ON 1s
SPS ON 1s
Operation
Grid supplied
Power button push > 20 sec
(until grid green LED flash)
Power button push >1 sec
100 mm
100 mm
Please keep enough space
for wiring and pipping.
(Max.: 400 mm)
Grid
SPS
Comm.
Definition
On Grid mode
On Grid count down
Grid setting "default"
PCS Error
Standalone mode
Standalone count down
Battery Error
Battery Power OFF
Communicating
No communication
SBMS Balance mode
SBMS Force_CHG
Maintenance Mode
Action
Power ON the unit
(AC start-up)
Power ON the unit
(Cold start-up)
Power OFF the unit
>30 mm*
100 mm
90°
500 mm

Advertisement

loading
Need help?

Need help?

Do you have a question about the BX6.3 AC100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Delta BX6.3 AC100

  • Page 1 Please adjust the Wi-Fi device position to improve the signal strength/quality. LED Indicators ⑦ ⑧ ⑨ ⑩ ⑪ Object Description Delta BX6.3_AC100 Residential AC ESS Grid The Instruction to provide the information of safety, Quick Installation Guide Installation and specification. Comm. WiFi antenna 2.4 Ghz Wi-Fi Antenna (IPX7) Antenna Bracket To support Wi-Fi antenna on BX6.3_AC100...
  • Page 2 Installation Current Transformer installation Grid 1. The CT can be opened. Insert Rawlplug CT label Energy meter of 2. Take the CT clip on the Line conductor wire. direction the electric utility company 3. please be aware of the CT direction. Arrow symbol means utility grid.

This manual is also suitable for:

Bx12.6 ac100